Subsidy guide · New Delhi district, Delhi
Plan an NHB subsidy polyhouse project in New Delhi
By Editorial Team, Kryzen Biotech · Updated 13 November 2026
For a commercial protected-cultivation project in New Delhi, NHB is the route to examine when the proposed area is above 2,500 m² and you will take a term loan. MIDH/NHM is generally the district horticulture route for an eligible beneficiary up to 4,000 m²; choose the scheme, obtain approvals and submit the application before starting any civil or structure work.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

Start with the right subsidy route, not the structure quotation
The overlap between the two schemes matters in New Delhi. MIDH/NHM is intended for individual farmers, groups and FPOs, with assistance of 50% of cost up to the applicable cost norm and an area limit of up to 4,000 m² per beneficiary. The application is made through the New Delhi district horticulture office.
NHB is the commercial-project route for farmers, companies, FPOs and entrepreneurs. It applies to projects above 2,500 m², requires a bank term loan, and gives a credit-linked, back-ended subsidy of 50% of project cost at admissible norms. The NHB guideline ceiling is ₹56 lakh per project, but current limits and norms must be confirmed before application. Because NHB assistance is back-ended, it is credited to the term-loan account after completion rather than functioning as construction cash in hand.
Do not assume that a one-acre proposal automatically means NHB is better. About one acre is 3,952 m², which is within MIDH’s 4,000 m² beneficiary area limit and also above NHB’s 2,500 m² project threshold. Discuss the intended route, land status, bank loan and crop plan with the district horticulture office and bank before fixing the project report.
- MIDH/NHM: up to 4,000 m² per beneficiary; apply at the New Delhi district horticulture office.
- NHB: above 2,500 m²; online In-Principle Approval (IPA) plus bank term loan are required.
- Both figures are based on applicable norms, which can be revised.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the New Delhi district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Which protected structure fits New Delhi heat and rain?
New Delhi’s main design challenge is the intense dry heat before the monsoon. May has a long-term average afternoon high of 42.8°C, with 6.7 kWh/m²/day of sun. June averages 42.1°C. January, by contrast, has a 5.9°C average night low. July is the wettest month at 217 mm, followed by August at 203 mm, so rain exclusion and drainage should be considered in the layout even though the annual rainfall is 750 mm.
A naturally ventilated polyhouse is the usual first choice here. Its film roof keeps monsoon rain off the crop, while roof vents and roll-up curtains provide air movement without power. It is a practical starting point for protected vegetables where the objective is rain protection, insect exclusion and a more controllable crop environment.
A fan and pad polyhouse is a good fit where the crop and operating plan justify active cooling. In May, a 43°C afternoon can be brought to about 31°C inside with pad cooling. This matters for leafy greens and other heat-sensitive production, but the farmer should plan for the equipment and operating requirements before selecting it. Curved nethouses can provide shade and more air at lower cost than a polyhouse; square nethouses are the NHB nursery design. A nethouse does not provide the rain protection of a film-roof polyhouse during July and August.
- Naturally ventilated polyhouse: usual first choice for New Delhi.
- Fan and pad: consider for active summer cooling and crop-specific needs.
- Nethouse: shade and ventilation option, but not the same monsoon rain cover as a polyhouse.

Naturally ventilated polyhouse
Best fitFilm roof keeps monsoon rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in New Delhi.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 43°C afternoon down to about 31°C inside, cool enough for leafy greens.

Square nethouse
Good fitFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Low rain here keeps it useful most of the year.

Curved nethouse
Good fitArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in May.
A one-acre NHB example: know what the norm means
The worked example below uses a fan and pad polyhouse over 3,952 m², about one acre. New Delhi is not under hilly norms. At the fan and pad structure cost norm of ₹1,400 per m², the eligible structure cost is ₹55,32,800. For high-value vegetables, the planting-material norm is ₹140 per m², adding ₹5,53,280.
That gives an eligible project cost of ₹60,86,080 and a maximum subsidy at 50% of the norm of ₹30,43,040 (₹30.43 lakh). This is an indicative calculation, not a sanction. The sanctioned amount depends on the approved project, prevailing norms and inspection. The displayed material price in the example is Polyhouse Constructions’ ex-factory material price, without freight or erection; it is not the project cost used for subsidy calculation.
For comparison when preparing a DPR, the current official norms cited for structures are ₹844/m² for tubular naturally ventilated polyhouse, ₹1,400/m² for fan and pad, and ₹710/m² for shade net house. A lower-cost structure norm should not be confused with the final cash cost of a complete farm project.
- Example area: 3,952 m².
- Example structure: fan and pad polyhouse.
- Maximum illustrative subsidy: ₹30,43,040 at 50% of the eligible norm.
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Crop plan: match planting-material norms with Delhi market timing
For subsidy planning, high-value vegetables have an NHB planting-material norm of ₹140 per m². The crop group listed as suitable for New Delhi includes coloured capsicum, parthenocarpic cucumber, lettuce and leafy greens. For flowers, the table lists carnation and gerbera at ₹610 per m², and rose and lilium at ₹426 per m²; it identifies gerbera and rose as suitable in New Delhi. Orchid and anthurium, with a ₹700 per m² norm, are marked less suited.
The crop should also have a marketing plan, not only a subsidy line in the DPR. New Delhi district data covers markets including APMC Azadpur, APMC Keshopur, APMC Shahdara and the Fruit and Vegetable Market, Gazipur. In the last two years of available mandi observations, capsicum’s highest modal price month was July at ₹5,397/q and cucumber’s was January at ₹2,616/q. Tomato was highest in November at ₹3,137/q, while coriander leaves reached its high in July at ₹7,522/q.
These historic mandi patterns are not price assurances. They are useful for thinking through harvest windows, crop duration and the risk of putting all area into one crop. May was the lowest-price month shown for cucumber, capsicum and tomato, while it is also New Delhi’s hottest month. A crop plan for a cooled structure may be different from one for a naturally ventilated polyhouse.
- High-value vegetables: ₹140 per m² planting-material norm.
- Capsicum: July was the highest recorded modal-price month in the district data.
- Cucumber: January was the highest recorded modal-price month in the district data.
| Crop group | NHB norm | Suits New Delhi? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Use mandi data to plan harvest windows, not promises
The district mandi table can help test whether the planned crop calendar makes commercial sense. Capsicum has an average modal price of ₹3,324/q across nine markets, with the observed high in July and the low in May at ₹1,621/q. Cucumber averages ₹2,098/q across 10 markets, with an observed January high and May low of ₹1,348/q.
For other possible rotations, cauliflower had its highest month in July at ₹5,027/q, tomato in November at ₹3,137/q, bitter gourd in February at ₹4,533/q, bottle gourd in December at ₹2,276/q and bhindi in December at ₹6,192/q. Protected cultivation does not remove market risk. Before including any crop in the DPR, consider the likely harvest month, grading and marketing route to Azadpur, Keshopur, Shahdara or Gazipur.
- Prices shown are modal mandi prices in ₹ per quintal.
- The data covers the last two years of observations in New Delhi district markets.
- Use crop diversification and harvest scheduling rather than relying on a single peak month.
| Crop | Markets | Average modal price | Highest month | Lowest month |
|---|---|---|---|---|
| Cucumber | 10 | ₹2,098/q | Jan (₹2,616) | May (₹1,348) |
| Brinjal | 10 | ₹1,912/q | Jul (₹2,266) | May (₹1,609) |
| Cabbage | 10 | ₹1,175/q | Nov (₹1,765) | May (₹680) |
| Tomato | 10 | ₹2,073/q | Nov (₹3,137) | May (₹1,027) |
| Cauliflower | 10 | ₹2,654/q | Jul (₹5,027) | Feb (₹854) |
| Capsicum | 9 | ₹3,324/q | Jul (₹5,397) | May (₹1,621) |
| Bottle gourd | 10 | ₹1,765/q | Dec (₹2,276) | May (₹1,141) |
| Bitter gourd | 9 | ₹2,921/q | Feb (₹4,533) | May (₹1,529) |
| Coriander (leaves) | 10 | ₹3,535/q | Jul (₹7,522) | Feb (₹1,328) |
| Okra (bhindi) | 9 | ₹3,574/q | Dec (₹6,192) | May (₹1,839) |
Application sequence in New Delhi: IPA must come before work
For MIDH, begin at the New Delhi district horticulture office. Ask for the current application process and confirm the applicable cost norm, inspection requirements and whether any state procedure changes affect the proposal. Submit the land and project documents through the prescribed route before beginning work.
For an NHB project, first obtain the supplier quotation and detailed project report, then file for In-Principle Approval on the NHB portal and work with the bank on the term loan. NHB has required IPA before work starts since 2017. Do not order material, erect the structure or start site work on the assumption that a later application will be accepted.
After approval and loan sanction, construct to the approved specifications and retain invoices and test certificates. The project is inspected after completion. NHB subsidy is then released into the loan account; MIDH release follows the state process after inspection.
- Choose size and structure before preparing the DPR.
- NHB: file IPA before starting work.
- Keep specifications, invoices and test certificates available for inspection.
- 1
Pick the structure and size
Match it to New Delhi's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.
- 3
Apply before you build
MIDH: apply at the New Delhi district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Documents and mistakes that can put a subsidy claim at risk
Keep land records in the applicant’s name—Delhi’s record of rights—or a registered lease, along with a site map. The basic file also needs Aadhaar, PAN and bank details. Companies and FPOs need their registration papers. A soil and water test report, itemised supplier quotation with HSN codes and specifications, and post-purchase invoices and test certificates are part of a sound record trail. An NHB file additionally requires the detailed project report and bank sanction letter.
The frequent avoidable error is starting before the route is approved, especially proceeding without NHB IPA. Other mistakes are using a generic DPR with no crop or repayment plan, submitting a quotation that does not itemise material, failing to retain invoices, and building something that differs from the approved specification. For an inspection-led claim, the paperwork and actual installed structure need to agree.
Polyhouse Constructions, a venture of Kryzen Biotech Pvt Ltd, manufactures complete material kits at its Satara factory: GI structure, polyfilm, nets and fittings. The GI structure uses ISI-marked branded steel from Tata, Jindal and JSW; lab test certificates and a technical data sheet are supplied with dispatch. Construction and erection are done by Kryzen Biotech’s construction team. Material can be supplied from the factory to New Delhi, but the company does not have a New Delhi office.
- Use an itemised quotation with HSN codes and specifications.
- For NHB, retain the bank sanction letter and approved DPR.
- Do not start work before IPA/approval and the applicable process are clear.
- Land records in your name (in Delhi: the record of rights), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Should I apply through MIDH or NHB for a 3,952 m² project in New Delhi?
A 3,952 m² project is within MIDH’s up-to-4,000 m² beneficiary limit and is also above NHB’s 2,500 m² commercial-project threshold. MIDH is applied for through the New Delhi district horticulture office, while NHB needs online IPA and a bank term loan; confirm the suitable route before work starts.
Is a naturally ventilated polyhouse enough for New Delhi?
It is the usual first choice because it keeps monsoon rain off the crop and uses roof vents and roll-up curtains for ventilation. For heat-sensitive crops, a fan and pad polyhouse can reduce a May afternoon of about 43°C to about 31°C inside.
What subsidy does the one-acre fan and pad example show?
For 3,952 m², the example shows eligible project cost of ₹60,86,080, including the ₹1,400/m² structure norm and ₹140/m² high-value vegetable planting-material norm. The illustrative maximum at 50% is ₹30,43,040, subject to approved norms, project sanction and inspection.
Can I start construction while NHB IPA is being processed?
No. NHB requires In-Principle Approval before work starts. Obtain the IPA, then the term-loan sanction, and build according to the approved project so that the inspection and documents match.
Which crops can I include in a New Delhi protected-cultivation DPR?
The suitable high-value vegetable group includes coloured capsicum, parthenocarpic cucumber, lettuce and leafy greens, with a planting-material norm of ₹140 per m². Gerbera and rose are also identified as suitable; use New Delhi mandi timing and your marketing plan when selecting the crop mix.
Subsidy projects near New Delhi
The same guide for nearby towns, with the structure that suits each.
| Town | From New Delhi | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Bhalswa Jahangir Pur | ~10 km | — | General | NVPH or fan & pad |
| Subsidy project in Delhi | ~10 km | New Delhi | General | NVPH or fan & pad |
| Subsidy project in Karawal Nagar | ~10 km | — | General | NVPH or fan & pad |
| Subsidy project in Nangloi Jat | ~20 km | West Delhi | General | NVPH or fan & pad |
| Subsidy project in Sultan Pur Majra | ~20 km | — | General | NVPH or fan & pad |
| Subsidy project in Loni | ~20 km | Ghaziabad | General | NVPH or fan & pad |
Sources
- NHB cost norms for protected cultivation
- NHB scheme guidelines (commercial horticulture)
- Mission for Integrated Development of Horticulture
- Kryzen: Polyhouse construction in New Delhi
- Kryzen: Polyhouse farming in New Delhi
- NASA POWER monthly climate averages for New Delhi
- Agmarknet daily prices (data.gov.in)