Polyhouse Constructions
How we ensure quality
By Editorial Team, Kryzen Biotech
A polyhouse fails at its weakest part: a thin pipe, a poorly coated clamp, a film that turns brittle in a year. Quality has to be controlled at every step, from the steel we buy to the truck that leaves the factory.

Quality at every step
| Stage | What we control |
|---|---|
| Raw material | Steel from Tata, Jindal and JSW; virgin HDPE nets; UV-stabilised 5-layer film |
| Manufacturing | Cutting, drilling and pressing in-house at Degaon, Satara, to the design drawing |
| Inspection | A 32-point QA checklist for every part before it is packed |
| Standards | ISI-marked components where required, and NHB / NHM technical norms |
| Documents | Lab test certificate with every dispatch; technical data sheet for every product |
| Packing and dispatch | Parts counted against the material list, so nothing is short or extra |
What you can check yourself on delivery
Pipe size and wall
Measure the OD and wall with a vernier against the specification.
Zinc coating
Compare the lab certificate’s coating figure with the quotation.
Film
Check the micron, width and print on the roll.
Count
Tick each line on the material list as you unload.
Get polyhouse material from India's biggest CEA manufacturing company
See every item, quantity and weekly rate before you pay.
FAQs
What is the 32-point checklist?
Every part is checked against a 32-point quality checklist before it is packed. Ask us for the checklist that applies to your order.
Who checks the quality?
Kryzen has dedicated product QA and construction QA teams, along with an ISO and audit function.
