Plan an NHB subsidy polyhouse project in Bengaluru

By Editorial Team, Kryzen Biotech · Updated 13 November 2026

For a commercial protected-cultivation project in Bengaluru, use the NHB route when the proposed project is above 2,500 m² and you are ready to take a term loan. For a smaller individual-farmer project, MIDH/NHM through the Bengaluru Urban district horticulture office is usually the route to examine; both schemes provide 50% assistance at admissible cost norms, subject to approval.

NHB route
Projects above 2,500 m²
MIDH / NHM route
Up to 4,000 m² per farmer
Cost norms here
General area
Structure for this climate
NVPH or fan & pad
Subsidy-eligible protected cultivation project like those planned in Bengaluru
Polyhouses, fan and pad houses and nethouses all qualify for 50% assistance at the cost norm.

First decide: MIDH through the district, or an NHB commercial project

The important decision is not simply which subsidy is larger. It is whether your area, financing plan and type of enterprise fit the scheme. MIDH/NHM is for individual farmers, groups and FPOs, with assistance of 50% of cost up to the applicable cost norm and an area limit of 4,000 m² per beneficiary. Application is made at the Bengaluru Urban district horticulture office.

NHB is meant for commercial projects by farmers, companies, FPOs and entrepreneurs. It applies above 2,500 m², requires a bank term loan, and the assistance is credit-linked and back-ended. That means the subsidy is credited to the loan account after completion rather than being money to start construction. The NHB scheme guidelines state a ceiling of ₹56 lakh per project; current limits and norms should be confirmed with the state horticulture department before applying.

There is an overlap in area between 2,500 m² and 4,000 m². In that band, compare the district-process MIDH option with the NHB loan-and-commercial-project route before committing to a design. Do not treat sanction as automatic under either route.

  • MIDH/NHM: up to 4,000 m² per beneficiary; apply through the Bengaluru Urban district horticulture office.
  • NHB: above 2,500 m²; apply online for In-Principle Approval and proceed with a bank term loan.
  • Bengaluru does not use hilly norms, so plan on the general norms.
MIDH / NHM (state mission)NHB commercial project
Who it is forIndividual farmers, groups, FPOsCommercial projects: farmers, companies, FPOs, entrepreneurs
Project sizeUp to 4,000 m² per beneficiaryAbove 2,500 m² (1,000 m² in the North-East)
Assistance50% of cost, up to the cost norm50% of project cost at admissible norms, credit-linked and back-ended
CeilingArea limit per beneficiary₹56 lakh per project in the NHB scheme guidelines; check the current limit
Bank loanNot always neededNeeded: subsidy is credited to the term loan
Apply atthe Bengaluru Urban district horticulture officeNHB online portal (In-Principle Approval) and your bank
From the NHB cost norms and MIDH guidelines. Limits and norms are revised from time to time and states may add their own top-up; confirm current figures with the state horticulture department before you apply.

Choose a structure for Bengaluru’s rain, humidity and heat

A naturally ventilated polyhouse is the practical first structure to assess for Bengaluru. Its film roof keeps rain off the crop through the wetter June–November period, while roof vents and roll-up curtains provide ventilation without power. This is useful because monthly humidity rises from 75% in June to 81% in October, while rainfall reaches 152 mm in September and 141 mm in October.

Fan-and-pad cooling is a good fit where the crop and operating plan justify it. April has the highest average afternoon temperature at 35.4°C, and a fan-and-pad house can bring a 35°C afternoon to about 29°C inside. That makes it relevant for crops needing more controlled summer conditions, including leafy greens. A square or curved nethouse is more seasonal here: November to February is the stated nethouse season, when rainfall is comparatively low. March has peak sunshine of 6.6 kWh/m²/day, so shade can also have a clear role then.

The approved structure must match the project report and specification. Select the crop and market plan first, then settle the structure, ventilation, cooling and crop-protection details rather than choosing only on initial material cost.

A one-acre fan-and-pad example: what the admissible norms show

The worked table below uses 3,952 m², about one acre, for a fan-and-pad polyhouse. At the structure cost norm of ₹1,400 per m², eligible structure cost is ₹55,32,800. For high-value vegetables, the planting-material norm in this illustration is ₹140 per m², or ₹5,53,280 for the area.

Together, the eligible project cost in this example is ₹60,86,080. At 50% of the norm, the maximum illustrative subsidy is ₹30,43,040 (₹30.43 lakh). This is an indicative calculation, not a sanction or a project quotation: the sanctioned amount depends on the approved project, current norms and inspection.

The table also separates the manufacturer’s current material price from the eligible project cost. Its listed material price is ₹32,48,775 including GST, or ₹822/m², ex-factory and without freight or erection. That distinction matters when preparing a DPR and arranging the bank loan; a subsidy norm is not the same as a supplier’s bill.

ItemAmount
StructureFan and pad polyhouse
Area3,952 m² (about one acre)
Structure cost norm₹1,400 per m²
Eligible structure cost₹55,32,800
Planting material norm (high-value vegetables)₹140 per m² → ₹5,53,280
Eligible project cost₹60,86,080
Maximum subsidy at 50% of the norm₹30,43,040 (₹30.43 lakh)
Our material price this week (incl. GST)₹32,48,775 (₹822/m²)
Indicative only: the sanctioned amount depends on the approved project, current norms and inspection. Material price is ours, ex-factory, without freight or erection.

Planting material and crop selection should follow the sales window

For a vegetable-led project, the NHB planting-material norm listed for high-value vegetables is ₹140 per m². Crops that suit Bengaluru in this group include coloured capsicum, parthenocarpic cucumber, tomato, lettuce and leafy greens. Fan-and-pad cooling deserves consideration for the leafy-green plan during hotter conditions; a naturally ventilated house is the usual first option for rain exclusion and ventilation.

Flower crop norms listed are ₹610 per m² for carnation and gerbera, and ₹426 per m² for rose and lilium. Gerbera and rose are identified as suitable for Bengaluru, while orchid and anthurium, with a norm of ₹700 per m², are less suited. A crop choice must still be supported by your own planting schedule, buyer plan, water quality and management capability.

Use Bengaluru-area mandi seasonality as one input, not as a promise of price. Capsicum had an average modal price of ₹4,032/q across eight markets, with the high month in November at ₹5,118 and the low month in April at ₹3,195. Cucumber’s recorded high was July at ₹2,426/q and its low was November at ₹1,182/q. Tomato peaked in December at ₹3,029/q and was lowest in March at ₹1,019/q. The district market list includes Binny Mill (F&V) Bengaluru APMC, Ramanagara APMC, Channapatana APMC, Kanakapura APMC and Doddaballa Pur APMC.

Crop groupNHB normSuits Bengaluru?
High-value vegetables₹140 per m²Yes: Coloured capsicum, Cucumber (parthenocarpic), Tomato, Lettuce and leafy greens
Orchid and anthurium₹700 per m²Less suited
Carnation and gerbera₹610 per m²Yes: Gerbera and rose
Rose and lilium₹426 per m²Yes: Gerbera and rose

Build the crop calendar around Bengaluru conditions and market risk

Bengaluru’s moderate temperatures do not remove the need for protected cultivation discipline. January nights average 13.5°C; April afternoons average 35.4°C; and June to November is humid. During the wetter months, focus on drainage, roof-film integrity, insect exclusion and airflow. Crop plans that ignore humidity and rain protection may face avoidable production risk even if the subsidy file is correct.

Mandi data can help you test more than one crop cycle. Beans recorded their highest month in May at ₹6,950/q and green chilli in February at ₹5,341/q. Brinjal, bitter gourd, cauliflower, ridge gourd and cabbage all show their highest listed month in November. These are district-market observations over the last two years, quoted in ₹ per quintal, not guaranteed future rates. Plan harvest timing, quality grading and buyer arrangements before planting.

  • Capsicum: high month November; low month April.
  • Cucumber: high month July; low month November.
  • Tomato: high month December; low month March.
  • Check the full price table before finalising crop cycles.
CropMarketsAverage modal priceHighest monthLowest month
Brinjal10₹2,503/qNov (₹4,306)Mar (₹1,596)
Beans10₹4,695/qMay (₹6,950)Feb (₹3,599)
Capsicum8₹4,032/qNov (₹5,118)Apr (₹3,195)
Tomato12₹2,088/qDec (₹3,029)Mar (₹1,019)
Cucumber11₹1,751/qJul (₹2,426)Nov (₹1,182)
Green chilli10₹4,452/qFeb (₹5,341)May (₹3,852)
Bitter gourd9₹2,872/qNov (₹3,323)Mar (₹2,202)
Cauliflower10₹2,329/qNov (₹3,124)Mar (₹1,569)
Ridge gourd10₹2,836/qNov (₹3,433)Mar (₹2,273)
Cabbage10₹1,212/qNov (₹1,673)Mar (₹740)
Agmarknet daily prices via data.gov.in, last two years, markets in Bengaluru Urban district. ₹ per quintal.

The correct application sequence in Bengaluru

Start with a site that can be documented, a realistic crop plan and a design sized for the scheme. Obtain an itemised quotation and project report. For an NHB project, the DPR should cover project cost, high-value vegetable crop planning and repayment, and it goes with the bank-finance process.

The non-negotiable step is timing: file for NHB In-Principle Approval on the NHB portal before work starts. IPA before commencement has been required since 2017. For MIDH, submit through the Bengaluru Urban district horticulture office before beginning construction. Starting excavation, purchasing material or erecting the house first can put subsidy eligibility at risk.

After NHB IPA, arrange the term-loan sanction and build to the approved standard. Preserve invoices and test certificates. Once the project is complete, inspection precedes release; NHB subsidy is released into the bank loan account, while MIDH release follows the state process.

  1. 1

    Pick the structure and size

    Match it to Bengaluru's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.

  2. 2

    Get a quotation and project report

    A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.

  3. 3

    Apply before you build

    MIDH: apply at the Bengaluru Urban district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.

  4. 4

    Bank loan (NHB)

    Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.

  5. 5

    Build to standard

    Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.

  6. 6

    Inspection and release

    After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Subsidy application steps for a polyhouse project in Bengaluru

Keep the file ready before you submit it

Prepare land records in your name—such as an RTC (Pahani) extract in Karnataka—or a registered lease, along with a site map. Keep Aadhaar, PAN and bank details ready. Companies and FPOs also need their registration papers. Soil and water test reports should be obtained early, as should the supplier quotation carrying specifications and HSN codes.

For NHB, add the detailed project report and bank sanction letter. After purchase, retain material invoices and test certificates. Make sure the quotation, project report, sanction request and final installation describe the same area and structure. A mismatch between those documents creates trouble at inspection.

Polyhouse Constructions is a manufacturer and supplies complete material kits from its factory at Degaon, on the Pune–Bangalore Highway in Wai taluka, Satara. The kit can include GI structure, polyfilm, nets and fittings. Construction or erection is done by Kryzen Biotech’s construction team; this is not a Bengaluru office-based supply claim.

  • Land records in your name (in Karnataka: RTC (Pahani) extract), or a registered lease, with a site map
  • Aadhaar, PAN and bank details; for companies and FPOs, registration papers
  • Soil and water test report
  • Supplier quotation with HSN codes and specifications
  • Detailed project report and bank sanction letter (NHB)
  • Test certificates and invoices for the material, after purchase
Itemised quotation for Bengaluru

Itemised quotation

Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates for Bengaluru

Lab test certificates

Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI for Bengaluru

ISI-marked GI

GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.

Avoid the mistakes that delay a subsidy claim

The biggest error is beginning work before approval—especially before NHB IPA. A second mistake is using an area that does not match the scheme route: do not assume an NHB commercial application is appropriate at or below 2,500 m², and do not overlook MIDH’s 4,000 m² per-beneficiary area limit.

Do not prepare the DPR from a broad lump-sum estimate. Ask for an itemised quotation with quantities, specifications and HSN codes, and keep invoices and certificates after purchase. The installed structure should meet the approved specification because the inspection checks the structure and specification.

Finally, do not budget only the published subsidy figure. NHB is back-ended against a term loan. Confirm current norms, local procedure and any state additions directly with the horticulture department before submitting. Polyhouse Constructions provides in-house engineered, manufactured material with a 32-point QA process, lab test certificates with dispatch and technical data sheets; its GI structure carries a 15-year warranty, polyfilm 2.5 years and nets 3 years.

  • Apply before construction, not after material arrives.
  • Keep the structure, area and crop plan consistent across every document.
  • Treat mandi prices and example subsidy figures as planning inputs, not assured returns or sanctions.

Buy from India's biggest CEA manufacturing company

Choose your structure and size and get the complete material list, priced this week.

Build your kit →

FAQs

Should I apply under MIDH or NHB for a Bengaluru polyhouse?

MIDH/NHM is the route to examine for up to 4,000 m² per beneficiary through the Bengaluru Urban district horticulture office. NHB is for commercial projects above 2,500 m² and requires a bank term loan, with subsidy credited back-ended to that loan.

Can I start construction before NHB approval?

No. NHB requires In-Principle Approval before work starts. Apply on the NHB portal, then proceed with the bank loan and construction after the required approvals.

What is the subsidy in the one-acre Bengaluru example?

For a 3,952 m² fan-and-pad polyhouse, the illustrative eligible project cost is ₹60,86,080. At 50% of the norm, the maximum illustrated subsidy is ₹30,43,040, subject to approval, current norms and inspection.

Which structure is most suitable for Bengaluru?

A naturally ventilated polyhouse is the usual first choice because it keeps June–November rain off the crop and provides ventilation without power. Fan-and-pad cooling is a good option for crops needing tighter summer control; it can bring a 35°C April afternoon to about 29°C inside.

Which documents should I take to the Bengaluru Urban horticulture office or bank?

Keep RTC (Pahani) land records or a registered lease, site map, Aadhaar, PAN, bank details, soil and water reports, and an itemised supplier quotation with HSN codes. NHB applications also need a DPR and bank sanction letter; preserve invoices and test certificates after purchase.

Subsidy projects near Bengaluru

The same guide for nearby towns, with the structure that suits each.

TownFrom BengaluruDistrictCost normsSuits
Subsidy project in Nelamangala~30 kmBengaluru NorthGeneralNVPH or fan & pad
Subsidy project in Magadi~50 km—GeneralNVPH or fan & pad
Subsidy project in Malur~50 kmKolarGeneralNVPH / nethouse
Subsidy project in Hosur~50 kmKrishnagiriGeneralNVPH or fan & pad
Subsidy project in Ramanagaram~60 km—GeneralNVPH or fan & pad
Subsidy project in Sidlaghatta~70 kmChikkaballapuraGeneralNVPH or fan & pad

All towns: Subsidy projects by town

Sources

  1. NHB cost norms for protected cultivation
  2. NHB scheme guidelines (commercial horticulture)
  3. Mission for Integrated Development of Horticulture