Subsidy guide · Maharashtra
NHB Subsidy Eligible Protected Cultivation Project in Arvi
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
If you are planning a polyhouse or nethouse in Arvi with government support, start here. We supply the material for subsidy projects across Maharashtra and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Arvi's climate and the general-area cost norms.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

NHB or MIDH: which scheme fits a project in Arvi
For a project in Arvi the first question is size. Up to 4,000 m², the MIDH route through the Maharashtra horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Arvi
Take a fan and pad polyhouse of 3,952 m² in Arvi, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
Mandi price seasons around Arvi
Across 12 mandis in nearby districts (Jalgaon, Amarawati, Nagpur, Betul), 8 polyhouse and nethouse crops trade regularly. Tomato has the most arrivals; Coriander (leaves) has the widest price swing (281%), peaking in October.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Tomato | 34 | ₹1,866/q | Dec · ₹2,683 | Mar · ₹820 | 227% |
| Green chilli | 36 | ₹3,698/q | Jul · ₹5,144 | Sep · ₹2,749 | 87% |
| Brinjal | 34 | ₹1,617/q | Jul · ₹2,254 | Mar · ₹1,003 | 125% |
| Okra (bhindi) | 34 | ₹2,895/q | Dec · ₹3,879 | Sep · ₹1,970 | 97% |
| Cauliflower | 32 | ₹1,878/q | Jul · ₹3,171 | Mar · ₹1,035 | 206% |
| Cabbage | 32 | ₹1,144/q | Jul · ₹1,550 | Apr · ₹689 | 125% |
| Coriander (leaves) | 33 | ₹3,310/q | Oct · ₹5,829 | Jan · ₹1,531 | 281% |
| Spinach | 32 | ₹2,027/q | Oct · ₹3,074 | Jan · ₹821 | 274% |
When to plant in Arvi for the best prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, tomato peaks in December; at about 75 days to first harvest, transplant in September.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Tomato | Jun, Jul, Nov, Dec | ~75 | September | Mar |
| Green chilli | Jul | ~75 | April | Sep |
| Brinjal | Jul, Sep, Nov, Dec | ~60 | May | Mar |
| Okra (bhindi) | Jan, Feb, Dec | ~45 | October | Sep |
| Cauliflower | Jul | ~75 | April | Mar |
| Cabbage | Jul, Aug, Nov | ~75 | April | Apr |
| Coriander (leaves) | Jul, Oct | ~35 | August | Jan |
| Spinach | Jul, Sep, Oct | ~30 | September | Jan |
Arvi month by month
May is the hottest month, with afternoons around 43.6°C; December nights drop to about 12.2°C. July is the wettest (301 mm of 1,021 mm a year), and humidity stays at 75% or more for 3 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 29.3°C | 12.4°C | 39% | 12 mm | 4.6 | 1.7 |
| Feb | 33.2°C | 15.9°C | 31% | 8 mm | 5.5 | 1.9 |
| Mar | 37.5°C | 20.4°C | 26% | 18 mm | 6.2 | 2 |
| Apr | 41.9°C | 25.3°C | 21% | 11 mm | 6.9 | 2.4 |
| May | 43.6°C | 28.8°C | 24% | 16 mm | 7 | 3.5 |
| Jun | 36.6°C | 26.4°C | 58% | 186 mm | 5.3 | 3.6 |
| Jul | 30.6°C | 23.5°C | 81% | 301 mm | 4.1 | 3.4 |
| Aug | 29.2°C | 22.8°C | 86% | 245 mm | 4.1 | 2.9 |
| Sep | 29.8°C | 22.3°C | 84% | 168 mm | 4.9 | 1.9 |
| Oct | 30°C | 19°C | 73% | 43 mm | 5.2 | 1.5 |
| Nov | 29.3°C | 15.1°C | 64% | 11 mm | 4.8 | 1.4 |
| Dec | 28.7°C | 12.2°C | 49% | 2 mm | 4.5 | 1.5 |
Steps to apply
- 1
Pick the structure and size
Match it to Arvi's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Arvi
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Arvi's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps monsoon rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Arvi.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 44°C afternoon down to about 31°C inside, cool enough for leafy greens.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from October to February, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in May.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Arvi? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Documents you will usually need
- Land records in your name (in Maharashtra: 7/12 extract (Satbara) and 8A), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Arvi project
We supply the complete material for subsidy projects in Maharashtra from our Satara factory, about 730 km from Arvi. See the kit and live price for your structure:
Arvi within Maharashtra
Among the 130 towns we supply in Maharashtra, Arvi ranks 1st for summer heat and 55th for yearly rain. Other Maharashtra towns on our list:
- Subsidy project in Mumbai
- Subsidy project in Pune
- Subsidy project in Navi Mumbai
- Subsidy project in Nagpur
- Subsidy project in Thane
- Subsidy project in Pimpri-Chinchwad
- Subsidy project in Nashik
- Subsidy project in Kalyan-Dombivli
- Subsidy project in Vasai-Virar
- Subsidy project in Chhatrapati Sambhajinagar
- Subsidy project in Solapur
- Subsidy project in Bhiwandi
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Arvi eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the district horticulture office.
How much subsidy can I get on 1 acre in Arvi?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Can I build first and apply later?
No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.
Are hilly-area norms used in Maharashtra?
Not generally; Maharashtra uses general-area norms.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Subsidy projects near Arvi
The same guide for nearby towns, with the structure that suits each.
| Town | From Arvi | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Pulgaon | ~40 km | — | General | NVPH or fan & pad |
| Subsidy project in Morshi | ~60 km | Amravati | General | NVPH or fan & pad |
| Subsidy project in Wardha | ~60 km | Wardha | General | NVPH or fan & pad |
| Subsidy project in Amravati | ~70 km | Amravati | General | NVPH or fan & pad |
| Subsidy project in Warud | ~70 km | Amravati | General | NVPH or fan & pad |
| Subsidy project in Narkhed | ~80 km | Nagpur | General | NVPH or fan & pad |