For a commercial protected-cultivation project in Kolkata, choose the subsidy route before ordering material or beginning civil work. MIDH/NHM is the state-mission route for up to 4,000 m² per beneficiary, while NHB is the credit-linked, back-ended route for commercial projects above 2,500 m²; both provide 50% assistance at applicable cost norms, subject to approval.

NHB route
Projects above 2,500 m²
MIDH / NHM route
Up to 4,000 m² per farmer
Cost norms here
General area
Structure for this climate
NVPH / nethouse
Subsidy-eligible protected cultivation project like those planned in Kolkata
Polyhouses, fan and pad houses and nethouses all qualify for 50% assistance at the cost norm.

Start with the right subsidy route, not the structure

The choice between MIDH/NHM and NHB is mainly about the project scale and financing. A farmer, group or FPO planning up to 4,000 m² per beneficiary can approach the Kolkata district horticulture office under MIDH/NHM. Assistance is 50% of cost up to the applicable cost norm, and a bank loan is not always necessary.

NHB suits a commercial project above 2,500 m². It is open to farmers, companies, FPOs and entrepreneurs, but it requires a term loan. The subsidy is credit-linked and back-ended: after completion and inspection, it is credited to the term-loan account rather than paid as upfront construction money. NHB guidelines state a ceiling of ₹56 lakh per project; confirm the current limit and norms before applying.

There is an overlap in area between 2,500 m² and 4,000 m². In that range, discuss both routes with the district horticulture office and your bank before selecting one. Do not assume that an application under one scheme can be shifted after work has started.

  • MIDH/NHM: up to 4,000 m² per beneficiary; apply at the Kolkata district horticulture office.
  • NHB: above 2,500 m²; apply for In-Principle Approval on the NHB portal and arrange a term loan.
  • Kolkata is not under hilly norms, so use the general norms, not the higher hilly/NE norms.
MIDH / NHM (state mission)NHB commercial project
Who it is forIndividual farmers, groups, FPOsCommercial projects: farmers, companies, FPOs, entrepreneurs
Project sizeUp to 4,000 m² per beneficiaryAbove 2,500 m² (1,000 m² in the North-East)
Assistance50% of cost, up to the cost norm50% of project cost at admissible norms, credit-linked and back-ended
CeilingArea limit per beneficiary₹56 lakh per project in the NHB scheme guidelines; check the current limit
Bank loanNot always neededNeeded: subsidy is credited to the term loan
Apply atthe Kolkata district horticulture officeNHB online portal (In-Principle Approval) and your bank
From the NHB cost norms and MIDH guidelines. Limits and norms are revised from time to time and states may add their own top-up; confirm current figures with the state horticulture department before you apply.

A naturally ventilated polyhouse is the practical Kolkata choice

Kolkata has a long wet, humid period. Humidity is 80% in June, rises to 87% in July and reaches 89% in August and September. July alone averages 333 mm rain, and annual rainfall is 1,567 mm. A naturally ventilated polyhouse keeps direct rain off the crop while roof vents and roll-up curtains allow air movement without depending on powered cooling.

This is usually a more suitable first structure than a fan-and-pad house here. April is the hottest month at 38.1°C, but its humidity is already 60%; evaporative pad cooling works poorly in these conditions. A fan-and-pad structure may be considered only where the crop genuinely needs tighter control and the operating plan supports it.

Square and curved nethouses are lower-cover options, but rain passes through them. They are better treated as seasonal structures in Kolkata, especially from November to February, when rainfall is lower. They are not the same solution as a film-roof polyhouse for protecting a high-value crop through the monsoon.

  • General NHB structure norm for naturally ventilated tubular polyhouse: ₹844 per m².
  • General NHB structure norm for fan & pad: ₹1,400 per m².
  • General NHB structure norm for shade net house: ₹710 per m².

Read the weather before scheduling a crop cycle

The planning issue in Kolkata is not only peak heat. April has the strongest sun, at 5.9 kWh/m²/day, with a 38.1°C afternoon high. From June to November, humidity remains high, rain is substantial and ventilation, drainage and crop hygiene need close attention. A project report should therefore specify crop cycles and management that suit a rain-protected structure, rather than treating a polyhouse as a completely sealed environment.

January is much milder, with a 24.4°C afternoon high and 10.2°C night low. November to February is the stated nethouse season. Use the monthly pattern to plan transplanting, market timing, ventilation and disease-control work, especially before the monsoon begins.

  • April: 38.1°C average afternoon high and 5.9 kWh/m²/day sun.
  • July: 333 mm rain and 87% humidity.
  • August and September: 89% humidity.
  • November: 23 mm rain; December: 9 mm rain.
MonthAfternoon highNight lowHumidityRainSun (kWh/m²/day)Wind (m/s)
Jan24.4°C10.2°C65%13 mm3.81.7
Feb29.6°C14.5°C57%20 mm4.71.7
Mar34.9°C19.8°C55%31 mm5.42
Apr38.1°C24.3°C60%50 mm5.92.9
May36.9°C26.2°C67%144 mm5.83
Jun33.1°C26.7°C80%231 mm4.63.1
Jul31.2°C26.1°C87%333 mm4.23.1
Aug30.7°C25.8°C89%308 mm4.22.5
Sep30.2°C25.2°C89%259 mm4.42
Oct29.7°C22.4°C84%146 mm4.41.5
Nov27.2°C16.6°C78%23 mm4.11.4
Dec24.1°C11.4°C74%9 mm3.61.6
NASA POWER long-term monthly averages for Kolkata.

One-acre NHB illustration: know what the subsidy is calculated on

For a 3,952 m² naturally ventilated polyhouse, about one acre, the structure cost norm is ₹844 per m². This gives an eligible structure cost of ₹33,35,488. If the project uses the high-value vegetables planting-material norm of ₹140 per m², the eligible planting-material amount is ₹5,53,280.

The eligible project cost in this illustration is ₹38,88,768. At 50% of the norm, the maximum subsidy is ₹19,44,384 (₹19.44 lakh). This is an illustration of admissible norms, not a promise of sanction or a cash-flow estimate. The sanctioned amount depends on the approved project, current norms and inspection.

The table below also lists our material price that week as ₹28,99,897 including GST, or ₹734/m². It is ex-factory and excludes freight and erection. A subsidy calculation and a supplier’s material quote are different figures; the quotation must be itemised and should not be substituted for the approved project cost.

  • Area: 3,952 m², about one acre.
  • Eligible project cost in this example: ₹38,88,768.
  • Maximum subsidy at 50% of the norm: ₹19,44,384 (₹19.44 lakh).
ItemAmount
StructureNaturally ventilated polyhouse
Area3,952 m² (about one acre)
Structure cost norm₹844 per m²
Eligible structure cost₹33,35,488
Planting material norm (high-value vegetables)₹140 per m² → ₹5,53,280
Eligible project cost₹38,88,768
Maximum subsidy at 50% of the norm₹19,44,384 (₹19.44 lakh)
Our material price this week (incl. GST)₹28,99,897 (₹734/m²)
Indicative only: the sanctioned amount depends on the approved project, current norms and inspection. Material price is ours, ex-factory, without freight or erection.

Crop groups, planting-material norms and Kolkata market timing

For an NHB project, high-value vegetables have a planting-material norm of ₹140 per m². Coloured capsicum and parthenocarpic cucumber suit this group and are practical candidates for a naturally ventilated polyhouse. Gerbera and rose are also listed as suitable crop options under the flower groups, while orchid and anthurium are less suited to Kolkata.

Market timing should be tested against actual crop harvest timing, not selected only from a price table. In Kolkata district, Sealdah Koley Market APMC and Sealdah Koley Market report tomato, capsicum, cucumber and other protected-cultivation crops. Capsicum’s highest recorded month in the available data is July at ₹8,525/q, while cucumber peaks in January at ₹5,993/q. Tomato is highest in December at ₹4,507/q.

Use the figures as a market-planning reference, not a future-price guarantee. A cucumber plan that targets January availability, for example, still needs to account for the crop’s own growing duration, quality, disease risk and likely volumes arriving in the market.

  • Capsicum: average modal price ₹5,957/q; highest month July at ₹8,525; lowest February at ₹3,077.
  • Cucumber: average modal price ₹4,629/q; highest month January at ₹5,993; lowest May at ₹3,684.
  • Tomato: average modal price ₹3,159/q; highest month December at ₹4,507; lowest March at ₹1,324.
  • High-value vegetables planting-material norm: ₹140 per m².
Crop groupNHB normSuits Kolkata?
High-value vegetables₹140 per m²Yes: Coloured capsicum, Cucumber (parthenocarpic)
Orchid and anthurium₹700 per m²Less suited
Carnation and gerbera₹610 per m²Yes: Gerbera and rose
Rose and lilium₹426 per m²Yes: Gerbera and rose

Where to apply and the order of work

For MIDH/NHM, begin at the Kolkata district horticulture office. Ask about the current state process, available allocation, applicable cost norm and inspection requirements. For NHB, prepare the project for the online portal, apply for In-Principle Approval (IPA), and take the approved plan to the bank for the term loan process.

IPA must come before work starts. NHB has required In-Principle Approval before starting work since 2017. Ordering material, putting up foundations, erecting the frame or beginning construction before IPA can put subsidy eligibility at risk. After loan sanction, build to the approved specification, retain invoices and test certificates, and proceed for inspection and release.

Polyhouse Constructions is a manufacturer of complete material kits, not a Kolkata office. Material is supplied from our Satara factory, and erection is done by Kryzen Biotech’s construction team. The kit can include the GI structure, polyfilm, nets and fittings; each online build shows items, quantities and that week’s rate.

  • First: choose area, structure, crop and scheme.
  • Then: obtain quotation and DPR; for NHB, apply for IPA before any work.
  • NHB: term loan, completion, joint inspection and back-ended subsidy into the loan account.
  • MIDH: follow the Kolkata district horticulture office process for inspection and release.
  1. 1

    Pick the structure and size

    Match it to Kolkata's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.

  2. 2

    Get a quotation and project report

    A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.

  3. 3

    Apply before you build

    MIDH: apply at the Kolkata district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.

  4. 4

    Bank loan (NHB)

    Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.

  5. 5

    Build to standard

    Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.

  6. 6

    Inspection and release

    After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Subsidy application steps for a polyhouse project in Kolkata

Keep these papers ready before submission

Land and site papers should be in order before a supplier quotation is finalised. Use land records in your name, which in West Bengal means Khatian (ROR), or a registered lease, along with a site map. The site, proposed area, irrigation and crop plan in the DPR should agree with these records.

For an NHB file, the bank sanction letter and detailed project report are essential. The DPR should cover cost, the high-value-vegetable crop plan and repayment. Both scheme and bank scrutiny are easier when every quotation line shows the item, quantity, specification, HSN code and GST details.

After purchase, preserve invoices and material test certificates for inspection. Our GI structure uses ISI-marked branded steel from Tata, Jindal and JSW. Polyhouse Constructions provides an itemised quotation, technical data sheets and lab test certificates with dispatch; the GI structure has a 15-year manufacturing warranty, while polyfilm has a 2.5-year warranty and nets a 3-year warranty.

  • Khatian (ROR) or registered lease, plus site map.
  • Aadhaar, PAN and bank details; registration papers for companies and FPOs.
  • Soil and water test report.
  • Supplier quotation, DPR and, for NHB, bank sanction letter.
  • Post-purchase invoices and material test certificates.
  • Land records in your name (in West Bengal: Khatian (ROR)), or a registered lease, with a site map
  • Aadhaar, PAN and bank details; for companies and FPOs, registration papers
  • Soil and water test report
  • Supplier quotation with HSN codes and specifications
  • Detailed project report and bank sanction letter (NHB)
  • Test certificates and invoices for the material, after purchase
Itemised quotation for Kolkata

Itemised quotation

Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates for Kolkata

Lab test certificates

Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI for Kolkata

ISI-marked GI

GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.

Avoid the errors that most often affect eligibility

The biggest mistake is treating subsidy as permission to start construction. It is not. For NHB, IPA is required before work begins, and a term loan is needed because the subsidy is back-ended. For MIDH, apply through the Kolkata district horticulture office and wait for the required approval process rather than relying on an informal assurance.

A second error is choosing a structure by initial price alone. Kolkata’s June–November humidity and monsoon rain make a rain-protected, naturally ventilated polyhouse a more logical baseline for many high-value vegetable projects than a nethouse. Fan-and-pad cooling should not be assumed to solve the April heat because evaporative cooling performs poorly at 60% humidity.

Finally, do not mix the norm with the actual purchase price or miss specification records. Confirm prevailing norms with the state horticulture department, submit an itemised quote, build to the approved standard, and retain every invoice and certificate for inspection.

  • Do not start foundations, erection or procurement before NHB IPA.
  • Do not use hilly/NE norms for Kolkata.
  • Do not plan subsidy as upfront money for an NHB loan project.
  • Do not discard quotations, invoices, technical sheets or test certificates.

Buy from India's biggest CEA manufacturing company

Choose your structure and size and get the complete material list, priced this week.

Build your kit →

FAQs

Should I apply through MIDH or NHB for a Kolkata polyhouse?

MIDH/NHM is for up to 4,000 m² per beneficiary and is applied for through the Kolkata district horticulture office. NHB is for commercial projects above 2,500 m², requires a term loan and uses an online In-Principle Approval process.

Can I begin construction while my NHB application is being processed?

No. NHB requires In-Principle Approval before work starts. Do not begin foundations, erection or material procurement until the required approval is in place.

What is the subsidy for a one-acre naturally ventilated polyhouse?

In the 3,952 m² illustrative project, eligible project cost is ₹38,88,768 and the maximum subsidy at 50% of the norm is ₹19,44,384 (₹19.44 lakh). Actual sanction depends on the approved project, current norms and inspection.

Which structure is suitable for Kolkata’s monsoon weather?

A naturally ventilated polyhouse is usually the first choice because its film roof keeps rain off the crop and vents provide passive air movement. Nethouses are more seasonal here, particularly from November to February, because rain passes through them.

Which documents will I need for an NHB project?

Prepare Khatian (ROR) or a registered lease with site map, Aadhaar, PAN, bank details, soil and water test report, supplier quotation and DPR. NHB also needs the bank sanction letter, while invoices and material test certificates must be retained after purchase.

Subsidy projects near Kolkata

The same guide for nearby towns, with the structure that suits each.

TownFrom KolkataDistrictCost normsSuits
Subsidy project in Bally~10 kmHowrahGeneralNVPH / nethouse
Subsidy project in Baranagar~10 km—GeneralNVPH / nethouse
Subsidy project in Howrah~10 kmHowrahGeneralNVPH / nethouse
Subsidy project in Kamarhati~20 km—GeneralNVPH / nethouse
Subsidy project in Madhyamgram~20 km—GeneralNVPH / nethouse
Subsidy project in Maheshtala~20 km—GeneralNVPH / nethouse

All towns: Subsidy projects by town

Sources

  1. NHB cost norms for protected cultivation
  2. NHB scheme guidelines (commercial horticulture)
  3. Mission for Integrated Development of Horticulture
  4. Kryzen: Polyhouse construction in Kolkata
  5. Kryzen: Polyhouse farming in Kolkata
  6. NASA POWER monthly climate averages for Kolkata
  7. Agmarknet daily prices (data.gov.in)
Build your kit