Subsidy guide · Maharajganj district, Uttar Pradesh
NHB Subsidy Eligible Protected Cultivation Project in Nautanwa
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
If you are planning a polyhouse or nethouse in Nautanwa with government support, start here. We supply the material for subsidy projects across Uttar Pradesh and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Nautanwa's climate and the general-area cost norms.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

Two subsidy routes for Nautanwa growers
Both schemes pay 50%; the difference is size and paperwork. Small and medium projects usually go through MIDH (run in Uttar Pradesh by the state horticulture mission), and larger commercial projects through the National Horticulture Board.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Maharajganj district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Nautanwa
Take a fan and pad polyhouse of 3,952 m² in Nautanwa, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
What protected crops fetch at mandis near Nautanwa
We averaged two years of daily Agmarknet prices from 8 markets in Maharajganj district for crops that are grown under cover. Tomato swings the most: about ₹2,585 per quintal in November against ₹857 in April, a 202% difference. Papaya is the steadiest, which makes it a safer second crop.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Green chilli | 8 | ₹2,549/q | Aug · ₹3,180 | Jan · ₹2,294 | 39% |
| Tomato | 8 | ₹1,768/q | Nov · ₹2,585 | Apr · ₹857 | 202% |
| Bottle gourd | 5 | ₹1,349/q | Dec · ₹1,576 | Jun · ₹1,072 | 47% |
| Brinjal | 5 | ₹1,470/q | Oct · ₹1,623 | Jan · ₹1,341 | 21% |
| Papaya | 4 | ₹2,451/q | Jan · ₹2,630 | Jul · ₹2,267 | 16% |
| Okra (bhindi) | 4 | ₹1,510/q | Apr · ₹2,672 | Jun · ₹1,206 | 122% |
| Cauliflower | 3 | ₹1,452/q | Dec · ₹2,194 | Feb · ₹883 | 148% |
| Bitter gourd | 5 | ₹1,766/q | Apr · ₹2,920 | Jul · ₹1,453 | 101% |
When to plant in Nautanwa for the best prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, green chilli peaks in August; at about 75 days to first harvest, transplant in May.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Green chilli | Aug | ~75 | May | Jan |
| Tomato | Aug, Nov, Dec | ~75 | August | Apr |
| Bottle gourd | Aug, Sep, Oct, Dec | ~55 | October | Jun |
| Brinjal | Jun, Jul, Aug, Sep, Oct, Nov | ~60 | August | Jan |
| Okra (bhindi) | Apr | ~45 | February | Jun |
| Cauliflower | Nov, Dec | ~75 | September | Feb |
| Bitter gourd | Apr | ~55 | February | Jul |
Nautanwa's weather, month by month
May is the hottest month, with afternoons around 39.9°C; January nights drop to about 8.9°C. July is the wettest (417 mm of 1,342 mm a year), and humidity stays at 75% or more for 3 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 21.7°C | 8.9°C | 47% | 17 mm | 3.5 | 1.5 |
| Feb | 26.3°C | 12.2°C | 41% | 23 mm | 4.6 | 1.9 |
| Mar | 32.7°C | 17.1°C | 31% | 18 mm | 5.9 | 2.2 |
| Apr | 38.3°C | 22.9°C | 25% | 20 mm | 6.6 | 2.3 |
| May | 39.9°C | 26°C | 33% | 67 mm | 6.5 | 2.2 |
| Jun | 38.4°C | 27.6°C | 50% | 217 mm | 5.7 | 2.1 |
| Jul | 33.1°C | 26.1°C | 77% | 417 mm | 4.6 | 2.1 |
| Aug | 32°C | 25.5°C | 82% | 301 mm | 4.8 | 1.7 |
| Sep | 31°C | 24°C | 81% | 200 mm | 4.7 | 1.6 |
| Oct | 30°C | 20°C | 68% | 55 mm | 4.9 | 1.2 |
| Nov | 26.7°C | 14.8°C | 56% | 2 mm | 4.2 | 1.3 |
| Dec | 22.7°C | 10.4°C | 50% | 5 mm | 3.5 | 1.3 |
Which subsidised structure to build in Nautanwa
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Nautanwa's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps monsoon rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Nautanwa.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 40°C afternoon down to about 29°C inside, cool enough for leafy greens.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from February to March, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in April.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Nautanwa? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Steps to apply
- 1
Pick the structure and size
Match it to Nautanwa's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.
- 3
Apply before you build
MIDH: apply at the Maharajganj district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Documents you will usually need
- Land records in your name (in Uttar Pradesh: Khatauni), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Nautanwa project
We supply the complete material for subsidy projects in Uttar Pradesh from our Satara factory, about 1,860 km from Nautanwa. See the kit and live price for your structure:
Nautanwa within Uttar Pradesh
Nautanwa is one of the cooler towns in Uttar Pradesh (108th hottest of 108), and among the wettest (1st for rain). These are the larger towns we supply elsewhere in Uttar Pradesh.
- Subsidy project in Kanpur
- Subsidy project in Lucknow
- Subsidy project in Agra
- Subsidy project in Meerut
- Subsidy project in Varanasi
- Subsidy project in Prayagraj
- Subsidy project in Aligarh
- Subsidy project in Bareilly
- Subsidy project in Moradabad
- Subsidy project in Gorakhpur
- Subsidy project in Loni
- Subsidy project in Saharanpur
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Nautanwa eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Maharajganj district horticulture office.
How much subsidy can I get on 1 acre in Nautanwa?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Can I build first and apply later?
No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.
Are hilly-area norms used in Uttar Pradesh?
Not generally; Uttar Pradesh uses general-area norms.
Subsidy projects near Nautanwa
The same guide for nearby towns, with the structure that suits each.
| Town | From Nautanwa | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Bagaha | ~100 km | West Champaran | General | NVPH or fan & pad |
| Subsidy project in Gorakhpur | ~100 km | Gorakhpur | General | NVPH or fan & pad |
| Subsidy project in Padrauna | ~100 km | Kushinagar | General | NVPH or fan & pad |
| Subsidy project in Ramnagar | ~120 km | — | General | NVPH or fan & pad |
| Subsidy project in Tulsipur | ~130 km | Balrampur | General | NVPH or fan & pad |
| Subsidy project in Utraula | ~130 km | Balrampur | General | NVPH or fan & pad |
