For a subsidy-eligible protected-cultivation project in Kanpur, first decide whether your proposed area and finance plan fit MIDH/NHM or the NHB commercial-project route. Kanpur’s severe April–June heat, July–September rain and humidity, and accessible vegetable markets make the structure, crop calendar and pre-approval sequence especially important.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

Start with the right scheme, not the structure quote
MIDH/NHM and NHB both show assistance at 50% of the applicable cost, but they are not the same route. MIDH/NHM is the state-mission option for individual farmers, groups and FPOs, with support up to 4,000 m² per beneficiary. The application goes to the district horticulture office.
NHB is for commercial projects by farmers, companies, FPOs and entrepreneurs. It applies to projects above 2,500 m², requires a term loan, and the assistance is credit-linked and back-ended: after completion and the required process, it is credited to the loan account rather than treated as advance construction money. The NHB scheme guidelines show a ceiling of ₹56 lakh per project; current limits and admissible norms should be confirmed with the state horticulture department before applying.
There is an area overlap between 2,500 m² and 4,000 m² in the published comparison. A Kanpur farmer in that range should discuss the intended scheme with the district horticulture office and, if considering NHB, the bank before committing to a design or starting work. Do not assume that a quote alone decides scheme eligibility.
- MIDH/NHM: up to 4,000 m² per beneficiary; apply through the district horticulture office.
- NHB: above 2,500 m²; online In-Principle Approval, a bank term loan and back-ended subsidy are required.
- Both routes: confirm the current norms, availability and state process before application.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Choose protection for Kanpur’s heat, rain and humidity
A naturally ventilated polyhouse is usually the practical first choice for Kanpur. Its film roof protects a crop in the rainy period, while roof vents and roll-up curtains provide ventilation without running fans. This matters because July receives 258 mm rain, followed by 216 mm in August and 148 mm in September; humidity reaches 72%, 80% and 78% in those months respectively.
The difficult summer decision is cooling. May has an average afternoon high of 43.4°C, with strong sun at 6.7 kWh/m²/day; April and June also exceed 40°C on average. A fan and pad polyhouse is a good fit where the crop plan, power arrangement and commercial budget justify it. In May, pads and exhaust fans can bring a 43°C afternoon to about 31°C inside, which is useful for leafy greens.
A square nethouse can suit nursery work, while a curved nethouse gives taller crops more air and costs less than a polyhouse. Shade is particularly relevant around the May sunlight peak. But a nethouse does not give the rain exclusion of a film-roof polyhouse, so it should not be selected merely because it is the lower-cost structure.
- Naturally ventilated polyhouse: the usual first choice for rain protection and passive airflow.
- Fan & pad polyhouse: consider for crops that need summer cooling.
- Square or curved nethouse: useful for nursery or shade-led production, with less rain protection.

Naturally ventilated polyhouse
Best fitFilm roof keeps monsoon rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Kanpur.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 43°C afternoon down to about 31°C inside, cool enough for leafy greens.

Square nethouse
Good fitFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Low rain here keeps it useful most of the year.

Curved nethouse
Good fitArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in May.
Build the project around a crop and a selling month
Protected cultivation should be planned against the market, not only the technical crop list. District-market data covers Kanpur(Grain) APMC, Pukharayan APMC, Baripaal APMC, Uttaripura APMC, Choubepur APMC and other listed markets. Nearby towns include Unnao at 20 km, Safipur at 40 km, Purwa at 50 km, Pukhrayan at 80 km and Kalpi at 90 km; transport and buyer arrangements should be decided before transplanting.
For the high-value vegetable group, coloured capsicum, parthenocarpic cucumber, lettuce and leafy greens suit Kanpur. Cucumber is especially worth timing carefully: the listed highest month is January at ₹2,359/q, compared with May at ₹1,094/q. Tomato’s listed peak is August at ₹3,233/q and green chilli’s is August at ₹4,403/q. These are historical market observations, not a promise of the next season’s price.
Other crop signals can help stagger risk. Brinjal and bitter gourd have their listed highest month in November; bottle gourd in December; cabbage and cauliflower in September; and bhindi in April. Use these months to test harvesting windows and likely competition, while allowing for your actual crop duration, grading, market access and disease management.
- Avoid designing the entire project around one historical high-price month.
- For a summer crop, account for the May heat before relying on an April or May harvest window.
- For monsoon production, plan ventilation, drainage and crop protection alongside the expected market window.
| Crop | Markets | Average modal price | Highest month | Lowest month |
|---|---|---|---|---|
| Tomato | 29 | ₹1,802/q | Aug (₹3,233) | Mar (₹697) |
| Green chilli | 30 | ₹3,042/q | Aug (₹4,403) | Jun (₹2,188) |
| Brinjal | 29 | ₹1,503/q | Nov (₹1,677) | Apr (₹1,318) |
| Bottle gourd | 26 | ₹1,332/q | Dec (₹1,669) | Jun (₹889) |
| Cabbage | 24 | ₹1,351/q | Sep (₹1,897) | Feb (₹760) |
| Cucumber | 19 | ₹1,912/q | Jan (₹2,359) | May (₹1,094) |
| Cauliflower | 27 | ₹1,819/q | Aug (₹3,450) | Feb (₹810) |
| Okra (bhindi) | 21 | ₹1,799/q | Apr (₹2,644) | Jun (₹1,208) |
| Papaya | 14 | ₹2,644/q | Nov (₹2,975) | Jan (₹2,207) |
| Bitter gourd | 15 | ₹2,170/q | Nov (₹2,606) | Jun (₹1,347) |
Planting-material norms and crop groups
For subsidy costing, planting material has its own admissible norm; it should be entered correctly in the project report rather than treated as an unrecorded farm input. The NHB planting-material norm shown for high-value vegetables is ₹140 per m². This is the relevant group for coloured capsicum, parthenocarpic cucumber, lettuce and leafy greens in Kanpur.
The listed norms are ₹700 per m² for orchid and anthurium, ₹610 per m² for carnation and gerbera, and ₹426 per m² for rose and lilium. The crop suitability guidance marks orchid and anthurium as less suited locally, while gerbera and rose are shown as suitable options. A farmer should still choose flowers only with a confirmed handling and sale plan, because a structure cannot by itself create a flower market.
Keep the planting-material line separate from the structure line in the DPR and quotation set. That makes it easier for the horticulture office, bank and inspection process to see what is being claimed under each admissible head.
- High-value vegetables: ₹140 per m².
- Orchid and anthurium: ₹700 per m².
- Carnation and gerbera: ₹610 per m²; rose and lilium: ₹426 per m².
| Crop group | NHB norm | Suits Kanpur? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
A one-acre fan-and-pad example: what the norms show
The worked example below uses a fan and pad polyhouse of 3,952 m², about one acre. It is an illustration of admissible norms and not a sanction letter. At the structure cost norm of ₹1,400 per m², eligible structure cost is ₹55,32,800. Adding high-value vegetable planting material at ₹140 per m², or ₹5,53,280, gives an eligible project cost of ₹60,86,080.
At 50% of the norm, the example’s maximum subsidy is ₹30,43,040 (₹30.43 lakh). The material price shown in the example is ₹32,48,775 including GST, or ₹822/m², and is ex-factory without freight or erection. It is the stated material price for that week, not the project cost used for subsidy calculation.
Kanpur is not under hilly norms in this brief. More importantly, the final sanctioned amount depends on the approved project, current norms and inspection. Do not turn this example into a financing commitment before the bank, department and NHB process, where relevant, have reviewed your actual DPR.
- Area: 3,952 m².
- Eligible project cost in the illustration: ₹60,86,080.
- Maximum subsidy at 50% of the norm: ₹30,43,040 (₹30.43 lakh).
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Kanpur application route: approval must come before work
For MIDH/NHM, take the proposed area, land papers, crop plan and supplier specifications to the district horticulture office before beginning the project. Ask the office to confirm the current application procedure, eligible design and inspection requirements. This is the appropriate local starting point for a farmer looking at a project up to 4,000 m².
For an NHB commercial project, file for In-Principle Approval on the NHB portal before work starts. NHB has required IPA before the start of work since 2017. Prepare the detailed project report, obtain the required term-loan sanction, and keep the approved scope consistent with the structure eventually built.
After approval, build to the required standard, preserve invoices and test certificates, and be ready for inspection. For NHB, the subsidy is released into the term-loan account after completion and the process; it is not a reason to start foundations, order materials or erect the frame before IPA.
- Decide route and area first.
- Obtain quotation and DPR next.
- MIDH: apply at the district horticulture office.
- NHB: obtain IPA before work, then proceed with the bank-linked project.
- 1
Pick the structure and size
Match it to Kanpur's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.
- 3
Apply before you build
MIDH: apply at the district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Documents that prevent avoidable queries
Keep land records in the applicant’s name—in Uttar Pradesh, Khatauni—or a registered lease, along with a site map. Aadhaar, PAN and bank details are needed; companies and FPOs also need their registration papers. Soil and water test reports should be kept with the technical and financial documents, not collected after the structure is erected.
The supplier quotation should be itemised, with size, quantity, HSN code and GST. An NHB file also needs a DPR and bank sanction letter. After purchase, retain material invoices and test certificates. These records support the inspection because the structure and its specification are checked.
Polyhouse Constructions is a manufacturer supplying complete material kits from its Satara factory: GI structure, polyfilm, nets and fittings. Its GI pipes are ISI-marked branded steel from Tata, Jindal and JSW, and it provides lab test certificates with dispatch and a technical data sheet for every product. Construction or erection is done by Kryzen Biotech’s construction team; Polyhouse Constructions does not have an office in Kanpur.
- Land record or registered lease and site map.
- Identity, bank and, where applicable, organisation registration papers.
- Soil and water reports, itemised quotation, DPR and NHB bank sanction letter.
- Invoices and material test certificates after purchase.
- Land records in your name (in Uttar Pradesh: Khatauni), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Mistakes that can put a subsidy plan at risk
The first mistake is beginning civil work, placing the project into execution, or erecting the structure before the relevant approval. For NHB, IPA is required before work starts. The second is choosing a design only from the headline subsidy amount: Kanpur’s 43.4°C May average high and humid monsoon months require a real ventilation, cooling and drainage decision.
Another common issue is mixing the material purchase price with the eligible project norm. The worked example makes clear that they are different figures. A third is an incomplete paper trail—generic quotations without HSN codes, missing land or lease papers, no test certificates, or invoices that do not match the approved work.
Finally, do not plant solely for a historic mandi peak. Check the crop’s harvest timing, whether the structure can maintain crop conditions in May or the monsoon, and where produce will be sold. A sound project connects scheme route, bank plan, structure, crop and marketing plan before construction starts.
- Do not start work before NHB IPA.
- Do not assume the material rate equals the eligible subsidy cost.
- Do not submit incomplete specifications, certificates or invoices.
- Do not rely on one past mandi-price peak.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 22.7°C | 7.5°C | 46% | 17 mm | 3.1 | 1.6 |
| Feb | 27.5°C | 11°C | 41% | 17 mm | 4.5 | 1.8 |
| Mar | 34.3°C | 16.6°C | 30% | 11 mm | 5.9 | 2 |
| Apr | 40.6°C | 23.6°C | 21% | 9 mm | 6.6 | 2.2 |
| May | 43.4°C | 28.5°C | 23% | 23 mm | 6.7 | 2.4 |
| Jun | 41.5°C | 30.4°C | 40% | 106 mm | 5.9 | 2.7 |
| Jul | 34.8°C | 27.4°C | 72% | 258 mm | 4.8 | 2.6 |
| Aug | 32.9°C | 25.9°C | 80% | 216 mm | 4.8 | 2.1 |
| Sep | 32.4°C | 24.1°C | 78% | 148 mm | 4.8 | 1.8 |
| Oct | 31.6°C | 19.5°C | 63% | 30 mm | 4.7 | 1.3 |
| Nov | 27.7°C | 13.7°C | 53% | 4 mm | 3.7 | 1.3 |
| Dec | 23.5°C | 9°C | 49% | 6 mm | 3 | 1.4 |
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Should I apply through MIDH/NHM or NHB for a Kanpur polyhouse?
MIDH/NHM is the state-mission route for projects up to 4,000 m² per beneficiary, applied for at the district horticulture office. NHB is for commercial projects above 2,500 m² and requires an online IPA and a term loan; the assistance is credit-linked and back-ended.
Can I start foundation or erection before NHB approval?
No. NHB requires In-Principle Approval before work starts. Obtain IPA, align the bank loan and approved DPR, then proceed with the project.
Which polyhouse is most suitable for Kanpur?
A naturally ventilated polyhouse is usually the first choice because it combines rain protection with roof vents and roll-up curtains. A fan and pad polyhouse is worth considering for crops needing summer cooling, as May averages 43.4°C in the afternoon.
What subsidy does the one-acre fan-and-pad example show?
For 3,952 m², the illustration shows an eligible project cost of ₹60,86,080 and a maximum 50% subsidy of ₹30,43,040 (₹30.43 lakh). This is indicative only; the final sanctioned amount depends on the approved project, current norms and inspection.
Which protected-cultivation crops should I examine first in Kanpur?
The high-value vegetable group includes coloured capsicum, parthenocarpic cucumber, lettuce and leafy greens, with a planting-material norm of ₹140 per m². For market timing, cucumber’s listed high month is January, while tomato and green chilli have listed highs in August; these historical observations should be checked against your crop calendar and buyer plan.
Subsidy projects near Kanpur
The same guide for nearby towns, with the structure that suits each.
| Town | From Kanpur | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Unnao | ~20 km | Unnao | General | NVPH or fan & pad |
| Subsidy project in Safipur | ~40 km | Unnao | General | NVPH or fan & pad |
| Subsidy project in Purwa | ~50 km | Unnao | General | NVPH or fan & pad |
| Subsidy project in Pukhrayan | ~80 km | Kanpur Dehat | General | NVPH or fan & pad |
| Subsidy project in Kalpi | ~90 km | Jalaun | General | NVPH or fan & pad |
| Subsidy project in Lucknow | ~90 km | Lucknow | General | NVPH or fan & pad |