If you are planning a polyhouse or nethouse in Mokokchung with government support, start here. We supply the material for subsidy projects across Nagaland and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Mokokchung's climate and the higher hilly-area cost norms.
- NHB route
- Projects above 1,000 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- Hilly (+15%)
- Structure for this climate
- NVPH / nethouse

NHB or MIDH: which scheme fits a project in Mokokchung
For a project in Mokokchung the first question is size. Up to 4,000 m², the MIDH route through the Nagaland horticulture department is usually simpler. Above 1,000 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 1,000 m² (the lower North-East limit) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Mokokchung district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Mokokchung
Take a naturally ventilated polyhouse of 3,952 m² in Mokokchung, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's hilly-area norms:
| Item | Amount |
|---|---|
| Structure | Naturally ventilated polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm (hilly) | ₹970 per m² |
| Eligible structure cost | ₹38,33,440 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹43,86,720 |
| Maximum subsidy at 50% of the norm | ₹21,93,360 (₹21.93 lakh) |
| Our material price this week (incl. GST) | ₹28,99,897 (₹734/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹734 per m² this week against a structure norm of ₹970; freight and erection come on top.
What protected crops fetch at mandis near Mokokchung
Prices at the mandis in Mokokchung district follow a clear yearly pattern. Cauliflower is the extreme case, from ₹1,211 per quintal in January up to ₹4,633 in March (283% more). That gap is what protected cultivation lets you aim for: a crop timed to the expensive months.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Cabbage | 4 | ₹2,417/q | Jun · ₹2,981 | Jan · ₹1,318 | 126% |
| Bitter gourd | 4 | ₹4,025/q | Feb · ₹4,717 | Nov · ₹3,000 | 57% |
| Brinjal | 6 | ₹3,177/q | Jun · ₹4,054 | Jan · ₹1,930 | 110% |
| Okra (bhindi) | 6 | ₹3,780/q | Jun · ₹4,900 | Dec · ₹3,087 | 59% |
| Cauliflower | 4 | ₹3,403/q | Mar · ₹4,633 | Jan · ₹1,211 | 283% |
When to plant in Mokokchung for the best prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, cabbage peaks in June; at about 75 days to first harvest, transplant in March.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Cabbage | Mar, May, Jun | ~75 | March | Jan |
| Bitter gourd | Feb, Apr, Jun, Jul | ~55 | December | Nov |
| Brinjal | Apr, May, Jun, Jul, Sep | ~60 | April | Jan |
| Okra (bhindi) | Apr, May, Jun | ~45 | April | Dec |
| Cauliflower | Mar, Nov | ~75 | December | Jan |
Mokokchung month by month
June is the hottest month, with afternoons around 31.7°C; January nights drop to about 9.4°C. July is the wettest (333 mm of 1,756 mm a year), and humidity stays at 75% or more for 6 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb, Mar, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 20.5°C | 9.4°C | 71% | 13 mm | 3.7 | 0.6 |
| Feb | 23.6°C | 11.4°C | 66% | 28 mm | 4.3 | 0.6 |
| Mar | 28°C | 14.9°C | 62% | 59 mm | 4.8 | 0.7 |
| Apr | 30.5°C | 18.8°C | 66% | 151 mm | 4.7 | 0.7 |
| May | 31.6°C | 21.3°C | 71% | 228 mm | 4.7 | 0.6 |
| Jun | 31.7°C | 23.2°C | 79% | 298 mm | 4.6 | 0.5 |
| Jul | 31°C | 23.5°C | 83% | 333 mm | 4.3 | 0.5 |
| Aug | 31.1°C | 23.7°C | 82% | 290 mm | 4.5 | 0.5 |
| Sep | 29.9°C | 22.5°C | 83% | 228 mm | 4.4 | 0.4 |
| Oct | 27.8°C | 19.5°C | 81% | 100 mm | 4.2 | 0.5 |
| Nov | 24.4°C | 14.7°C | 77% | 19 mm | 4.1 | 0.5 |
| Dec | 21.3°C | 11°C | 74% | 9 mm | 3.7 | 0.6 |
Steps to apply
- 1
Pick the structure and size
Match it to Mokokchung's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 1,000 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the Mokokchung district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design and hilly-area specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Mokokchung
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Mokokchung's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps June–November rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Mokokchung.

Fan & pad polyhouse
LimitedPads cool by evaporation, which works poorly at 79% humidity in June. Consider it only for crops that need tight control.

Square nethouse
Good fitFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Low rain here keeps it useful most of the year.

Curved nethouse
Good fitArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Rain passes through, so pick crops that tolerate it.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Mokokchung? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Broccoli and zucchini, Coloured capsicum, Cucumber (parthenocarpic) |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Carnation |
| Rose and lilium | ₹426 per m² | Yes: Lilium |
Documents you will usually need
- Land records in your name (in Nagaland: the record of rights), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Mokokchung project
We supply the complete material for subsidy projects in Nagaland from our Satara factory, about 3,000 km from Mokokchung. See the kit and live price for your structure:
Mokokchung within Nagaland
Among the 6 towns we supply in Nagaland, Mokokchung ranks 4th for summer heat and 1st for yearly rain. Other Nagaland towns on our list:
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Mokokchung eligible for NHB subsidy?
Yes, if the project is above 1,000 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Mokokchung district horticulture office.
How much subsidy can I get on 1 acre in Mokokchung?
For a 3,952 m² naturally ventilated polyhouse with high-value vegetables, up to about ₹21.93 lakh at NHB's hilly norms (50% of ₹43,86,720). The sanctioned figure depends on the approved project.
Are hilly-area norms used in Nagaland?
Yes, Nagaland is treated as a hilly state, so cost norms are about 15% higher, which raises the subsidy.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Subsidy projects near Mokokchung
The same guide for nearby towns, with the structure that suits each.
| Town | From Mokokchung | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Tuensang | ~40 km | Tuensang | Hilly | NVPH / nethouse |
| Subsidy project in Wokha | ~50 km | Wokha | Hilly | NVPH / nethouse |
| Subsidy project in Zunheboto | ~50 km | Zunheboto | Hilly | NVPH / nethouse |
| Subsidy project in Mariani | ~60 km | Jorhat | Hilly | NVPH / nethouse |
| Subsidy project in Jorhat | ~80 km | Jorhat | Hilly | NVPH / nethouse |
| Subsidy project in Sibsagar | ~100 km | Sivasagar | Hilly | NVPH / nethouse |