A subsidy-ready protected cultivation project in Madikeri needs three things: the right scheme for its size, a structure the scheme recognises, and paperwork that matches. Here is how the National Horticulture Board (NHB) and the Mission for Integrated Development of Horticulture (MIDH) apply in Karnataka, and what a 3,952 m² project would look like.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH / nethouse

NHB or MIDH: which scheme fits a project in Madikeri
For a project in Madikeri the first question is size. Up to 4,000 m², the MIDH route through the Karnataka horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Kodagu district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Madikeri
Take a naturally ventilated polyhouse of 3,952 m² in Madikeri, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Naturally ventilated polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹844 per m² |
| Eligible structure cost | ₹33,35,488 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹38,88,768 |
| Maximum subsidy at 50% of the norm | ₹19,44,384 (₹19.44 lakh) |
| Our material price this week (incl. GST) | ₹28,99,897 (₹734/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹734 per m² this week against a structure norm of ₹844; freight and erection come on top.
What protected crops fetch at mandis near Madikeri
Across 12 mandis in nearby districts (Mysuru, Mysore, Hassan, Kannur), 8 polyhouse and nethouse crops trade regularly. Cucumber has the most arrivals; Tomato has the widest price swing (126%), peaking in December.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Cucumber | 59 | ₹2,954/q | Jul · ₹3,375 | Feb · ₹2,599 | 30% |
| Brinjal | 45 | ₹3,326/q | Nov · ₹4,726 | Mar · ₹2,492 | 90% |
| Tomato | 46 | ₹2,467/q | Dec · ₹3,469 | Mar · ₹1,535 | 126% |
| Okra (bhindi) | 43 | ₹5,256/q | Nov · ₹6,734 | May · ₹4,508 | 49% |
| Green chilli | 46 | ₹5,259/q | Feb · ₹5,843 | Jun · ₹4,658 | 25% |
| Bitter gourd | 39 | ₹5,041/q | Aug · ₹6,123 | Feb · ₹4,172 | 47% |
| Snake gourd | 29 | ₹3,474/q | Aug · ₹4,018 | Mar · ₹3,084 | 30% |
| Ridge gourd | 39 | ₹4,341/q | Nov · ₹5,007 | May · ₹3,857 | 30% |
When to plant in Madikeri for the best prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, cucumber peaks in July; at about 40 days to first harvest, transplant in May.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Cucumber | Jul, Aug, Sep, Oct, Dec | ~40 | May | Feb |
| Brinjal | Nov | ~60 | September | Mar |
| Tomato | May, Dec | ~75 | September | Mar |
| Okra (bhindi) | Nov, Dec | ~45 | September | May |
| Green chilli | Jan, Feb, Mar, Aug, Nov, Dec | ~75 | November | Jun |
| Bitter gourd | Aug | ~55 | June | Feb |
| Snake gourd | Aug, Sep, Nov | ~55 | June | Mar |
| Ridge gourd | Jan, Aug, Nov, Dec | ~50 | September | May |
Madikeri's weather, month by month
March is the hottest month, with afternoons around 34.1°C; January nights drop to about 15.9°C. July is the wettest (774 mm of 2,993 mm a year), and humidity stays at 75% or more for 8 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 29.3°C | 15.9°C | 66% | 2 mm | 5.5 | 0.5 |
| Feb | 32.4°C | 17.5°C | 58% | 5 mm | 6.1 | 0.5 |
| Mar | 34.1°C | 19.9°C | 58% | 22 mm | 6.4 | 0.6 |
| Apr | 33°C | 21.4°C | 68% | 63 mm | 6.2 | 0.5 |
| May | 30°C | 21.6°C | 79% | 192 mm | 5.5 | 0.7 |
| Jun | 26°C | 21°C | 90% | 688 mm | 3.9 | 0.9 |
| Jul | 24.7°C | 20.6°C | 93% | 774 mm | 3.5 | 1 |
| Aug | 24.9°C | 20.3°C | 93% | 581 mm | 3.9 | 0.9 |
| Sep | 25.6°C | 20°C | 91% | 331 mm | 4.7 | 0.7 |
| Oct | 26.2°C | 19.7°C | 89% | 230 mm | 4.8 | 0.5 |
| Nov | 26.3°C | 18.3°C | 84% | 89 mm | 5 | 0.5 |
| Dec | 26.7°C | 16.5°C | 77% | 16 mm | 5 | 0.5 |
Steps to apply
- 1
Pick the structure and size
Match it to Madikeri's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the Kodagu district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Madikeri
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Madikeri's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps May–December rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Madikeri.

Fan & pad polyhouse
LimitedPads cool by evaporation, which works poorly at 58% humidity in March. Consider it only for crops that need tight control.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from January to April, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Rain passes through, so pick crops that tolerate it.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Madikeri? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Broccoli and zucchini, Coloured capsicum, Cucumber (parthenocarpic) |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Carnation |
| Rose and lilium | ₹426 per m² | Yes: Lilium |
Documents you will usually need
- Land records in your name (in Karnataka: RTC (Pahani) extract), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Madikeri project
We supply the complete material for subsidy projects in Karnataka from our Satara factory, about 840 km from Madikeri. See the kit and live price for your structure:
Madikeri within Karnataka
Among the 81 towns we supply in Karnataka, Madikeri ranks 81st for summer heat and 6th for yearly rain. Other Karnataka towns on our list:
- Subsidy project in Bengaluru
- Subsidy project in Hubli-Dharwad
- Subsidy project in Mysore
- Subsidy project in Kalaburagi
- Subsidy project in Mangaluru
- Subsidy project in Belagavi
- Subsidy project in Davanagere
- Subsidy project in Ballari
- Subsidy project in Vijayapura
- Subsidy project in Shivamogga
- Subsidy project in Tumkur
- Subsidy project in Raayachuru
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Madikeri eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Kodagu district horticulture office.
How much subsidy can I get on 1 acre in Madikeri?
For a 3,952 m² naturally ventilated polyhouse with high-value vegetables, up to about ₹19.44 lakh at NHB's general norms (50% of ₹38,88,768). The sanctioned figure depends on the approved project.
Are hilly-area norms used in Karnataka?
Not generally; Karnataka uses general-area norms.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Subsidy projects near Madikeri
The same guide for nearby towns, with the structure that suits each.
| Town | From Madikeri | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Piriyapatna | ~50 km | Mysuru | General | NVPH / nethouse |
| Subsidy project in Sakaleshapura | ~70 km | Hassan | General | NVPH / nethouse |
| Subsidy project in Mattannur | ~80 km | Kannur | General | NVPH / nethouse |
| Subsidy project in Taliparamba | ~80 km | Kannur | General | NVPH / nethouse |
| Subsidy project in Puttur | ~90 km | Dakshina Kannada | General | NVPH / nethouse |
| Subsidy project in Kanhangad | ~90 km | Kasaragod | General | NVPH / nethouse |