Subsidy guide · Kalaburgi district, Karnataka
NHB Subsidy Eligible Protected Cultivation Project in Shahabad
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
Polyhouses and nethouses in Shahabad can get 50% government assistance, but which scheme applies depends on the size of your project, and the amount depends on the government cost norm, not your bill. This page walks through both routes for a project in Shahabad (Kalaburgi district), with a worked example for the structure that suits Shahabad's climate.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

NHB or MIDH: which scheme fits a project in Shahabad
For a project in Shahabad the first question is size. Up to 4,000 m², the MIDH route through the Karnataka horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Kalaburgi district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Shahabad
Take a fan and pad polyhouse of 3,952 m² in Shahabad, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
Local market prices for polyhouse crops near Shahabad
Across 3 mandis in Kalaburgi district, 8 polyhouse and nethouse crops trade regularly. Capsicum has the most arrivals; Papaya has the widest price swing (10909%), peaking in May.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Capsicum | 3 | ₹3,084/q | Mar · ₹3,539 | Aug · ₹2,351 | 51% |
| Beans | 3 | ₹2,788/q | Feb · ₹3,403 | Oct · ₹2,017 | 69% |
| Green chilli | 3 | ₹2,508/q | Mar · ₹2,789 | Nov · ₹2,159 | 29% |
| Brinjal | 3 | ₹2,321/q | Oct · ₹2,609 | Aug · ₹1,871 | 39% |
| Tomato | 3 | ₹1,186/q | Jun · ₹1,988 | Feb · ₹732 | 172% |
| Papaya | 3 | ₹2,791/q | May · ₹4,954 | Dec · ₹45 | 10909% |
| Okra (bhindi) | 2 | ₹2,412/q | Mar · ₹2,911 | Sep · ₹2,118 | 37% |
| Muskmelon | 3 | ₹4,320/q | Jul · ₹5,615 | Jan · ₹2,009 | 179% |
Timing your crop for the Shahabad market
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, capsicum peaks in March; at about 90 days to first harvest, transplant in December.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Capsicum | Feb, Mar, Apr, May, Jun | ~90 | December | Aug |
| Beans | Jan, Feb, Mar, Jun | ~50 | December | Oct |
| Green chilli | Feb, Mar, Apr, May, Jul, Oct | ~75 | December | Nov |
| Brinjal | Jan, Feb, Mar, May, Jun, Oct, Nov, Dec | ~60 | August | Aug |
| Tomato | May, Jun | ~75 | March | Feb |
| Okra (bhindi) | Mar, Dec | ~45 | January | Sep |
| Muskmelon | May, Jul | ~70 | April | Jan |
Shahabad month by month
May is the hottest month, with afternoons around 40.6°C; December nights drop to about 14.7°C. September is the wettest (164 mm of 721 mm a year), and humidity stays at 75% or more for 3 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 31.9°C | 15.2°C | 43% | 3 mm | 5 | 2.1 |
| Feb | 35°C | 17.9°C | 34% | 3 mm | 5.9 | 2.2 |
| Mar | 38.3°C | 21.8°C | 30% | 16 mm | 6.4 | 2.1 |
| Apr | 40.4°C | 25.7°C | 32% | 24 mm | 6.7 | 2.2 |
| May | 40.6°C | 26.9°C | 38% | 41 mm | 6.7 | 3.3 |
| Jun | 34°C | 23.8°C | 64% | 102 mm | 5.4 | 4.3 |
| Jul | 31.8°C | 22.5°C | 71% | 131 mm | 4.5 | 4.7 |
| Aug | 31°C | 21.9°C | 75% | 142 mm | 4.6 | 3.9 |
| Sep | 30.4°C | 21.6°C | 79% | 164 mm | 4.9 | 2.4 |
| Oct | 30.3°C | 19.7°C | 75% | 78 mm | 5.1 | 1.9 |
| Nov | 30.5°C | 16.7°C | 65% | 15 mm | 4.9 | 2.1 |
| Dec | 30.8°C | 14.7°C | 53% | 2 mm | 4.8 | 2 |
Steps to apply
- 1
Pick the structure and size
Match it to Shahabad's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the Kalaburgi district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Shahabad
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Shahabad's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps monsoon rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Shahabad.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 41°C afternoon down to about 31°C inside, cool enough for leafy greens.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from October to January, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in April.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Shahabad? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Documents you will usually need
- Land records in your name (in Karnataka: RTC (Pahani) extract), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Shahabad project
We supply the complete material for subsidy projects in Karnataka from our Satara factory, about 430 km from Shahabad. See the kit and live price for your structure:
Across Kalaburgi district
Among the 81 towns we supply in Karnataka, Shahabad ranks 2nd for summer heat and 53rd for yearly rain. Other Kalaburgi district towns on our list:
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Shahabad eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Kalaburgi district horticulture office.
How much subsidy can I get on 1 acre in Shahabad?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Are hilly-area norms used in Karnataka?
Not generally; Karnataka uses general-area norms.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Subsidy projects near Shahabad
The same guide for nearby towns, with the structure that suits each.
| Town | From Shahabad | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Wadi | ~10 km | Kalaburgi | General | NVPH or fan & pad |
| Subsidy project in Kalaburagi | ~30 km | Kalaburgi | General | NVPH or fan & pad |
| Subsidy project in Sedam | ~50 km | Kalaburgi | General | NVPH or fan & pad |
| Subsidy project in Shahpur | ~60 km | — | General | NVPH or fan & pad |
| Subsidy project in Yadgir | ~60 km | — | General | NVPH or fan & pad |
| Subsidy project in Afzalpur | ~80 km | Kalaburgi | General | NVPH or fan & pad |