Polyhouses and nethouses in Risod can get 50% government assistance, but which scheme applies depends on the size of your project, and the amount depends on the government cost norm, not your bill. This page walks through both routes for a project in Risod (Washim district), with a worked example for the structure that suits Risod's climate.

NHB route
Projects above 2,500 m²
MIDH / NHM route
Up to 4,000 m² per farmer
Cost norms here
General area
Structure for this climate
NVPH or fan & pad
Subsidy-eligible protected cultivation project like those planned in Risod
Polyhouses, fan and pad houses and nethouses all qualify for 50% assistance at the cost norm.

Two subsidy routes for Risod growers

Both schemes pay 50%; the difference is size and paperwork. Small and medium projects usually go through MIDH (run in Maharashtra by the state horticulture mission), and larger commercial projects through the National Horticulture Board.

MIDH / NHM (state mission)NHB commercial project
Who it is forIndividual farmers, groups, FPOsCommercial projects: farmers, companies, FPOs, entrepreneurs
Project sizeUp to 4,000 m² per beneficiaryAbove 2,500 m² (1,000 m² in the North-East)
Assistance50% of cost, up to the cost norm50% of project cost at admissible norms, credit-linked and back-ended
CeilingArea limit per beneficiary₹56 lakh per project in the NHB scheme guidelines; check the current limit
Bank loanNot always neededNeeded: subsidy is credited to the term loan
Apply atthe Washim district horticulture officeNHB online portal (In-Principle Approval) and your bank
From the NHB cost norms and MIDH guidelines. Limits and norms are revised from time to time and states may add their own top-up; confirm current figures with the state horticulture department before you apply.

Worked example: a 3,952 m² project in Risod

Take a fan and pad polyhouse of 3,952 m² in Risod, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:

ItemAmount
StructureFan and pad polyhouse
Area3,952 m² (about one acre)
Structure cost norm₹1,400 per m²
Eligible structure cost₹55,32,800
Planting material norm (high-value vegetables)₹140 per m² → ₹5,53,280
Eligible project cost₹60,86,080
Maximum subsidy at 50% of the norm₹30,43,040 (₹30.43 lakh)
Our material price this week (incl. GST)₹32,48,775 (₹822/m²)
Indicative only: the sanctioned amount depends on the approved project, current norms and inspection. Material price is ours, ex-factory, without freight or erection.

Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.

Mandi price seasons around Risod

Prices at the mandis in Washim district follow a clear yearly pattern. Coriander (leaves) is the extreme case, from ₹1,266 per quintal in January up to ₹5,043 in October (298% more). That gap is what protected cultivation lets you aim for: a crop timed to the expensive months.

CropMarketsAverageHighest monthLowest monthSwing
Tomato17₹1,327/qJun · ₹1,941Mar · ₹712173%
Methi (fenugreek leaves)9₹1,944/qJun · ₹3,207Jan · ₹944240%
Coriander (leaves)7₹2,649/qOct · ₹5,043Jan · ₹1,266298%
Cucumber14₹2,214/qDec · ₹2,990Mar · ₹1,55692%
Brinjal13₹3,433/qNov · ₹5,756Apr · ₹2,218160%
Bitter gourd11₹3,289/qJun · ₹4,796Oct · ₹1,848160%
Cabbage8₹982/qNov · ₹1,426Apr · ₹444221%
Cauliflower7₹1,288/qNov · ₹1,619Apr · ₹89880%
Agmarknet daily modal prices via data.gov.in, Nov 2024 – Nov 2026, markets in Washim district. ₹ per quintal (100 kg).

Timing your crop for the Risod market

Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, tomato peaks in June; at about 75 days to first harvest, transplant in March.

CropSells bestDays to first harvestTransplant / sow inAvoid harvesting in
TomatoJun, Jul, Aug~75MarchMar
Methi (fenugreek leaves)Jun, Oct~25MayJan
Coriander (leaves)Oct~35AugustJan
CucumberJun, Dec~40OctoberMar
BrinjalNov, Dec~60SeptemberApr
Bitter gourdJan, Jun~55AprilOct
CabbageJun, Nov~75AugustApr
CauliflowerJun, Jul, Nov~75AugustApr
Days to harvest are typical for polyhouse and nethouse crops and vary by variety and season. Plan nursery raising 3–5 weeks before transplanting.

Twelve months of weather in Risod

May is the hottest month, with afternoons around 42°C; January nights drop to about 12.6°C. July is the wettest (235 mm of 873 mm a year), and humidity stays at 75% or more for 3 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Oct, Nov, Dec.

MonthAfternoon highNight lowHumidityRainSun (kWh/m²/day)Wind (m/s)
Jan29.4°C12.6°C39%7 mm4.81.8
Feb33.3°C16.1°C30%5 mm5.62
Mar37°C20°C26%17 mm6.42
Apr40.8°C24.4°C22%8 mm6.92.4
May42°C27.1°C28%14 mm73.8
Jun35°C24.8°C60%155 mm5.43.9
Jul30.4°C22.6°C78%235 mm4.33.8
Aug29°C21.9°C84%202 mm4.23.3
Sep29.2°C21.4°C83%162 mm4.82.2
Oct29.3°C18.7°C74%51 mm5.11.6
Nov28.8°C15.3°C64%14 mm4.81.6
Dec28.6°C12.7°C49%3 mm4.51.6
NASA POWER long-term monthly averages for Risod (19.98, 76.79).

Which subsidised structure to build in Risod

All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Risod's weather.

Planting material norms and crops that suit

NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.

Crop groupNHB normSuits Risod?
High-value vegetables₹140 per m²Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens
Orchid and anthurium₹700 per m²Less suited
Carnation and gerbera₹610 per m²Yes: Gerbera and rose
Rose and lilium₹426 per m²Yes: Gerbera and rose

Steps to apply

  1. 1

    Pick the structure and size

    Match it to Risod's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.

  2. 2

    Get a quotation and project report

    A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.

  3. 3

    Apply before you build

    MIDH: apply at the Washim district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.

  4. 4

    Bank loan (NHB)

    Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.

  5. 5

    Build to standard

    Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.

  6. 6

    Inspection and release

    After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Subsidy application steps for a polyhouse project in Risod

Documents you will usually need

  • Land records in your name (in Maharashtra: 7/12 extract (Satbara) and 8A), or a registered lease, with a site map
  • Aadhaar, PAN and bank details; for companies and FPOs, registration papers
  • Soil and water test report
  • Supplier quotation with HSN codes and specifications
  • Detailed project report and bank sanction letter (NHB)
  • Test certificates and invoices for the material, after purchase

What we provide for your file:

Itemised quotation for Risod

Itemised quotation

Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates for Risod

Lab test certificates

Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI for Risod

ISI-marked GI

GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.

Material for your Risod project

We supply the complete material for subsidy projects in Maharashtra from our Satara factory, about 480 km from Risod. See the kit and live price for your structure:

Risod and the rest of Washim district

Risod is mid-table for heat in Maharashtra (54th of 130), and in the middle for rain (78th). We also supply 2 other towns in Washim district.

Buy from India's biggest CEA manufacturing company

Choose your structure and size and get the complete material list, priced this week.

Build your kit →

FAQs

Is a polyhouse in Risod eligible for NHB subsidy?

Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Washim district horticulture office.

How much subsidy can I get on 1 acre in Risod?

For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.

Do you help with the subsidy file?

We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.

Is the subsidy paid on my bill or on the cost norm?

Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.

Can I build first and apply later?

No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.

Are hilly-area norms used in Maharashtra?

Not generally; Maharashtra uses general-area norms.

Subsidy projects near Risod

The same guide for nearby towns, with the structure that suits each.

TownFrom RisodDistrictCost normsSuits
Subsidy project in Lonar~40 kmBuldhanaGeneralNVPH or fan & pad
Subsidy project in Mehkar~40 kmBuldhanaGeneralNVPH or fan & pad
Subsidy project in Washim~50 kmWashimGeneralNVPH or fan & pad
Subsidy project in Patur~70 kmAkolaGeneralNVPH or fan & pad
Subsidy project in Mangrulpir~90 kmWashimGeneralNVPH or fan & pad
Subsidy project in Sailu~90 kmParbhaniGeneralNVPH or fan & pad

All towns: Subsidy projects by town

Sources

  1. NHB cost norms for protected cultivation
  2. NHB scheme guidelines (commercial horticulture)
  3. Mission for Integrated Development of Horticulture
  4. Kryzen: Polyhouse construction in Risod
  5. Kryzen: Polyhouse farming in Risod
  6. NASA POWER monthly climate averages for Risod
Build your kit