Subsidy guide · Chengalpattu district, Tamil Nadu
NHB Subsidy Eligible Protected Cultivation Project in Pudupattinam
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
A subsidy-ready protected cultivation project in Pudupattinam needs three things: the right scheme for its size, a structure the scheme recognises, and paperwork that matches. Here is how the National Horticulture Board (NHB) and the Mission for Integrated Development of Horticulture (MIDH) apply in Tamil Nadu, and what a 3,952 m² project would look like.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH / nethouse

NHB or MIDH: which scheme fits a project in Pudupattinam
For a project in Pudupattinam the first question is size. Up to 4,000 m², the MIDH route through the Tamil Nadu horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Chengalpattu district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Pudupattinam
Take a naturally ventilated polyhouse of 3,952 m² in Pudupattinam, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Naturally ventilated polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹844 per m² |
| Eligible structure cost | ₹33,35,488 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹38,88,768 |
| Maximum subsidy at 50% of the norm | ₹19,44,384 (₹19.44 lakh) |
| Our material price this week (incl. GST) | ₹28,99,897 (₹734/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹734 per m² this week against a structure norm of ₹844; freight and erection come on top.
Local market prices for polyhouse crops near Pudupattinam
Prices at the mandis in Chengalpattu district follow a clear yearly pattern. Tomato is the extreme case, from ₹1,848 per quintal in March up to ₹4,001 in December (117% more). That gap is what protected cultivation lets you aim for: a crop timed to the expensive months.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Beans | 16 | ₹6,352/q | May · ₹8,287 | Feb · ₹5,252 | 58% |
| Okra (bhindi) | 16 | ₹4,513/q | Jan · ₹5,001 | Sep · ₹3,901 | 28% |
| Green chilli | 16 | ₹4,864/q | Aug · ₹5,531 | Apr · ₹4,247 | 30% |
| Brinjal | 16 | ₹4,245/q | Jun · ₹4,835 | Apr · ₹3,750 | 29% |
| Bottle gourd | 16 | ₹3,519/q | Sep · ₹4,497 | Apr · ₹3,067 | 47% |
| Tomato | 17 | ₹2,897/q | Dec · ₹4,001 | Mar · ₹1,848 | 117% |
| Snake gourd | 16 | ₹3,715/q | Jun · ₹3,954 | Apr · ₹3,352 | 18% |
| Ridge gourd | 16 | ₹5,218/q | Oct · ₹5,415 | Apr · ₹4,802 | 13% |
When to plant in Pudupattinam for the best prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, beans peaks in May; at about 50 days to first harvest, transplant in March.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Beans | May | ~50 | March | Feb |
| Okra (bhindi) | Jan, Feb, Mar, Jun, Jul, Nov, Dec | ~45 | November | Sep |
| Green chilli | Jul, Aug, Sep, Oct | ~75 | May | Apr |
| Brinjal | Jun, Jul, Nov, Dec | ~60 | April | Apr |
| Bottle gourd | Sep | ~55 | July | Apr |
| Tomato | Nov, Dec | ~75 | September | Mar |
| Snake gourd | Jan, Feb, May, Jun, Jul, Aug, Sep, Oct, Nov, Dec | ~55 | April | Apr |
| Ridge gourd | Jan, Feb, May, Jun, Jul, Aug, Sep, Oct, Nov, Dec | ~50 | August | Apr |
Pudupattinam month by month
May is the hottest month, with afternoons around 34.6°C; January nights drop to about 21.4°C. November is the wettest (293 mm of 1,240 mm a year), and humidity stays at 75% or more for 5 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 27.5°C | 21.4°C | 77% | 18 mm | 5.2 | 3.2 |
| Feb | 29.4°C | 22°C | 73% | 7 mm | 6 | 2.9 |
| Mar | 32.3°C | 24°C | 70% | 16 mm | 6.5 | 3 |
| Apr | 33.9°C | 26.3°C | 70% | 28 mm | 6.6 | 3.5 |
| May | 34.6°C | 27.5°C | 68% | 62 mm | 6 | 3.8 |
| Jun | 34°C | 26.9°C | 67% | 65 mm | 5.5 | 3.8 |
| Jul | 33.2°C | 26.3°C | 68% | 97 mm | 5.1 | 3.7 |
| Aug | 32.4°C | 25.8°C | 73% | 126 mm | 5.2 | 3.4 |
| Sep | 31.3°C | 25.6°C | 77% | 140 mm | 5.3 | 2.9 |
| Oct | 29.9°C | 25.3°C | 80% | 255 mm | 4.8 | 2.7 |
| Nov | 28.3°C | 24°C | 82% | 293 mm | 4.3 | 3.6 |
| Dec | 27.3°C | 22.4°C | 80% | 133 mm | 4.3 | 3.8 |
Steps to apply
- 1
Pick the structure and size
Match it to Pudupattinam's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the Chengalpattu district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Pudupattinam
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Pudupattinam's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps September–January rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Pudupattinam.

Fan & pad polyhouse
LimitedPads cool by evaporation, which works poorly at 68% humidity in May. Consider it only for crops that need tight control.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from January to April, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in April.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Pudupattinam? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Tomato |
| Orchid and anthurium | ₹700 per m² | Yes: Anthurium and orchids |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Documents you will usually need
- Land records in your name (in Tamil Nadu: Patta and Chitta (with A-Register)), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Pudupattinam project
We supply the complete material for subsidy projects in Tamil Nadu from our Satara factory, about 1,170 km from Pudupattinam. See the kit and live price for your structure:
Across Chengalpattu district
Among the 119 towns we supply in Tamil Nadu, Pudupattinam ranks 102nd for summer heat and 30th for yearly rain. Other Chengalpattu district towns on our list:
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Pudupattinam eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Chengalpattu district horticulture office.
How much subsidy can I get on 1 acre in Pudupattinam?
For a 3,952 m² naturally ventilated polyhouse with high-value vegetables, up to about ₹19.44 lakh at NHB's general norms (50% of ₹38,88,768). The sanctioned figure depends on the approved project.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Can I build first and apply later?
No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.
Subsidy projects near Pudupattinam
The same guide for nearby towns, with the structure that suits each.
| Town | From Pudupattinam | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Nandivaram-Guduvancheri | ~50 km | — | General | NVPH / nethouse |
| Subsidy project in Uthiramerur | ~60 km | Kanchipuram | General | NVPH / nethouse |
| Subsidy project in Pallavaram | ~70 km | Chengalpattu | General | NVPH / nethouse |
| Subsidy project in Kancheepuram | ~80 km | Kanchipuram | General | NVPH / nethouse |
| Subsidy project in Tindivanam | ~80 km | Viluppuram | General | NVPH / nethouse |
| Subsidy project in Vandavasi | ~80 km | Tiruvannamalai | General | NVPH / nethouse |