Subsidy guide · Jharkhand
NHB Subsidy Eligible Protected Cultivation Project in Patratu
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
If you are planning a polyhouse or nethouse in Patratu with government support, start here. We supply the material for subsidy projects across Jharkhand and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Patratu's climate and the general-area cost norms.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

Two subsidy routes for Patratu growers
Both schemes pay 50%; the difference is size and paperwork. Small and medium projects usually go through MIDH (run in Jharkhand by the state horticulture mission), and larger commercial projects through the National Horticulture Board.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Patratu
Take a fan and pad polyhouse of 3,952 m² in Patratu, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
Mandi price seasons around Patratu
Prices at the mandis in nearby district (Gaya) follow a clear yearly pattern. Okra (bhindi) is the extreme case, from ₹402 per quintal in September up to ₹3,000 in November (646% more). That gap is what protected cultivation lets you aim for: a crop timed to the expensive months.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Okra (bhindi) | 2 | ₹1,295/q | Nov · ₹3,000 | Sep · ₹402 | 646% |
| Bottle gourd | 2 | ₹1,327/q | Nov · ₹3,039 | Aug · ₹576 | 428% |
A planting calendar built on local prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, okra (bhindi) peaks in November; at about 45 days to first harvest, transplant in September.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Okra (bhindi) | Nov | ~45 | September | Sep |
| Bottle gourd | Nov | ~55 | September | Aug |
Twelve months of weather in Patratu
May is the hottest month, with afternoons around 39.1°C; January nights drop to about 7.6°C. July is the wettest (349 mm of 1,323 mm a year), and humidity stays at 75% or more for 4 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 22.2°C | 7.6°C | 54% | 15 mm | 3.8 | 1.6 |
| Feb | 26.7°C | 11.2°C | 46% | 17 mm | 4.7 | 1.8 |
| Mar | 32.1°C | 16.2°C | 36% | 22 mm | 5.7 | 2 |
| Apr | 37.5°C | 21.6°C | 30% | 25 mm | 6.3 | 2.1 |
| May | 39.1°C | 24.3°C | 39% | 53 mm | 6.2 | 2.3 |
| Jun | 34.8°C | 24.6°C | 62% | 208 mm | 5.1 | 2.7 |
| Jul | 29.4°C | 23°C | 85% | 349 mm | 4.2 | 2.6 |
| Aug | 28.3°C | 22.6°C | 89% | 312 mm | 4.3 | 2.3 |
| Sep | 27.8°C | 21.7°C | 88% | 226 mm | 4.4 | 2 |
| Oct | 26.5°C | 17.9°C | 80% | 82 mm | 4.5 | 1.4 |
| Nov | 23.9°C | 12.8°C | 70% | 6 mm | 4.1 | 1.2 |
| Dec | 21.7°C | 8.7°C | 62% | 8 mm | 3.6 | 1.4 |
Which subsidised structure to build in Patratu
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Patratu's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps July–October rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Patratu.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 41°C afternoon down to about 31°C inside, cool enough for leafy greens.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from February to March, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Rain passes through, so pick crops that tolerate it.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Patratu? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Steps to apply
- 1
Pick the structure and size
Match it to Patratu's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.
- 3
Apply before you build
MIDH: apply at the district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Documents you will usually need
- Land records in your name (in Jharkhand: Khatiyan), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Patratu project
We supply the complete material for subsidy projects in Jharkhand from our Satara factory, about 1,740 km from Patratu. See the kit and live price for your structure:
Patratu within Jharkhand
Patratu is one of the hotter towns in Jharkhand (2nd of 27 we cover), and in the middle for rain (11th). These are the larger towns we supply elsewhere in Jharkhand.
- Subsidy project in Jamshedpur
- Subsidy project in Dhanbad
- Subsidy project in Ranchi
- Subsidy project in Bokaro Steel City
- Subsidy project in Mango
- Subsidy project in Deoghar
- Subsidy project in Phusro
- Subsidy project in Adityapur
- Subsidy project in Hazaribagh
- Subsidy project in Giridih
- Subsidy project in Sahibganj
- Subsidy project in Ramgarh
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Patratu eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the district horticulture office.
How much subsidy can I get on 1 acre in Patratu?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Are hilly-area norms used in Jharkhand?
Not generally; Jharkhand uses general-area norms.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Subsidy projects near Patratu
The same guide for nearby towns, with the structure that suits each.
| Town | From Patratu | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Saunda | ~10 km | — | General | NVPH or fan & pad |
| Subsidy project in Ramgarh | ~30 km | — | General | NVPH or fan & pad |
| Subsidy project in Hazaribagh | ~50 km | Hazaribagh | General | NVPH or fan & pad |
| Subsidy project in Ranchi | ~50 km | Ranchi | General | NVPH or fan & pad |
| Subsidy project in Gumia | ~70 km | Bokaro | General | NVPH or fan & pad |
| Subsidy project in Tenu dam-cum-Kathhara | ~80 km | Bokaro | General | NVPH or fan & pad |
