How it worksBuy individual items

Subsidy guide · Latur district, Maharashtra

NHB Subsidy Eligible Protected Cultivation Project in Nilanga

By Editorial Team, Kryzen Biotech · Updated 12 November 2026

Polyhouses and nethouses in Nilanga can get 50% government assistance, but which scheme applies depends on the size of your project, and the amount depends on the government cost norm, not your bill. This page walks through both routes for a project in Nilanga (Latur district), with a worked example for the structure that suits Nilanga's climate.

NHB route
Projects above 2,500 m²
MIDH / NHM route
Up to 4,000 m² per farmer
Cost norms here
General area
Structure for this climate
NVPH or fan & pad
Subsidy-eligible protected cultivation project like those planned in Nilanga
Polyhouses, fan and pad houses and nethouses all qualify for 50% assistance at the cost norm.

NHB or MIDH: which scheme fits a project in Nilanga

For a project in Nilanga the first question is size. Up to 4,000 m², the MIDH route through the Maharashtra horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.

MIDH / NHM (state mission)NHB commercial project
Who it is forIndividual farmers, groups, FPOsCommercial projects: farmers, companies, FPOs, entrepreneurs
Project sizeUp to 4,000 m² per beneficiaryAbove 2,500 m² (1,000 m² in the North-East)
Assistance50% of cost, up to the cost norm50% of project cost at admissible norms, credit-linked and back-ended
CeilingArea limit per beneficiary₹56 lakh per project in the NHB scheme guidelines; check the current limit
Bank loanNot always neededNeeded: subsidy is credited to the term loan
Apply atthe Latur district horticulture officeNHB online portal (In-Principle Approval) and your bank
From the NHB cost norms and MIDH guidelines. Limits and norms are revised from time to time and states may add their own top-up; confirm current figures with the state horticulture department before you apply.

Worked example: a 3,952 m² project in Nilanga

Take a fan and pad polyhouse of 3,952 m² in Nilanga, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:

ItemAmount
StructureFan and pad polyhouse
Area3,952 m² (about one acre)
Structure cost norm₹1,400 per m²
Eligible structure cost₹55,32,800
Planting material norm (high-value vegetables)₹140 per m² → ₹5,53,280
Eligible project cost₹60,86,080
Maximum subsidy at 50% of the norm₹30,43,040 (₹30.43 lakh)
Our material price this week (incl. GST)₹32,48,775 (₹822/m²)
Indicative only: the sanctioned amount depends on the approved project, current norms and inspection. Material price is ours, ex-factory, without freight or erection.

Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.

Local market prices for polyhouse crops near Nilanga

Across 12 mandis in nearby districts (Dharashiv, Chandrapur, Kalaburagi, Kalburgi), 8 polyhouse and nethouse crops trade regularly. Tomato has the most arrivals; Coriander (leaves) has the widest price swing (248%), peaking in October.

CropMarketsAverageHighest monthLowest monthSwing
Tomato33₹1,316/qJun · ₹1,938Mar · ₹793144%
Green chilli30₹3,300/qMar · ₹4,073Nov · ₹2,66953%
Brinjal33₹2,555/qNov · ₹3,464Apr · ₹1,77495%
Cauliflower28₹1,496/qJun · ₹2,059Mar · ₹955116%
Okra (bhindi)28₹2,878/qDec · ₹3,580Aug · ₹2,15466%
Cucumber26₹2,197/qNov · ₹2,648Mar · ₹1,54272%
Coriander (leaves)21₹1,488/qOct · ₹2,528Jan · ₹726248%
Bitter gourd26₹2,850/qJun · ₹4,098Sep · ₹1,968108%
Agmarknet daily modal prices via data.gov.in, Nov 2024 – Nov 2026, markets in nearby districts (Dharashiv, Chandrapur, Kalaburagi, Kalburgi). ₹ per quintal (100 kg).

Timing your crop for the Nilanga market

Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, tomato peaks in June; at about 75 days to first harvest, transplant in March.

CropSells bestDays to first harvestTransplant / sow inAvoid harvesting in
TomatoMay, Jun, Dec~75MarchMar
Green chilliFeb, Mar, Jul~75DecemberNov
BrinjalJun, Nov~60SeptemberApr
CauliflowerJun, Jul, Nov~75MarchMar
Okra (bhindi)Jan, Feb, Nov, Dec~45OctoberAug
CucumberJun, Oct, Nov~40SeptemberMar
Coriander (leaves)Oct~35AugustJan
Bitter gourdJun~55AprilSep
Days to harvest are typical for polyhouse and nethouse crops and vary by variety and season. Plan nursery raising 3–5 weeks before transplanting.

Nilanga month by month

May is the hottest month, with afternoons around 40.2°C; December nights drop to about 13.2°C. September is the wettest (174 mm of 788 mm a year), and humidity stays at 75% or more for 3 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Oct, Nov, Dec.

MonthAfternoon highNight lowHumidityRainSun (kWh/m²/day)Wind (m/s)
Jan30.2°C13.7°C42%4 mm4.92
Feb33.8°C16.9°C32%4 mm5.82.1
Mar37.1°C20.7°C28%16 mm6.42.1
Apr39.6°C24.6°C30%21 mm6.82.2
May40.2°C26.2°C35%35 mm6.93.3
Jun33.4°C23.2°C64%117 mm5.34.3
Jul30.5°C21.7°C74%156 mm4.44.5
Aug29.5°C21.2°C79%166 mm4.43.8
Sep29°C20.8°C82%174 mm4.92.4
Oct28.8°C18.6°C76%79 mm5.11.9
Nov28.6°C15.2°C67%14 mm4.92
Dec28.8°C13.2°C53%2 mm4.71.9
NASA POWER long-term monthly averages for Nilanga (18.12, 76.75).

Steps to apply

  1. 1

    Pick the structure and size

    Match it to Nilanga's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.

  2. 2

    Get a quotation and project report

    An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.

  3. 3

    Apply before you build

    MIDH: apply at the Latur district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.

  4. 4

    Bank loan (NHB)

    Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.

  5. 5

    Build to standard

    Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.

  6. 6

    Inspection and release

    After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Subsidy application steps for a polyhouse project in Nilanga

Eligible structures and how they suit Nilanga

All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Nilanga's weather.

Planting material norms and crops that suit

NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.

Crop groupNHB normSuits Nilanga?
High-value vegetables₹140 per m²Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens
Orchid and anthurium₹700 per m²Less suited
Carnation and gerbera₹610 per m²Yes: Gerbera and rose
Rose and lilium₹426 per m²Yes: Gerbera and rose

Documents you will usually need

  • Land records in your name (in Maharashtra: 7/12 extract (Satbara) and 8A), or a registered lease, with a site map
  • Aadhaar, PAN and bank details; for companies and FPOs, registration papers
  • Soil and water test report
  • Supplier quotation with HSN codes and specifications
  • Detailed project report and bank sanction letter (NHB)
  • Test certificates and invoices for the material, after purchase

What we provide for your file:

Itemised quotation for Nilanga

Itemised quotation

Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates for Nilanga

Lab test certificates

Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI for Nilanga

ISI-marked GI

GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.

Material for your Nilanga project

We supply the complete material for subsidy projects in Maharashtra from our Satara factory, about 390 km from Nilanga. See the kit and live price for your structure:

Across Latur district

Among the 130 towns we supply in Maharashtra, Nilanga ranks 77th for summer heat and 110th for yearly rain. Other Latur district towns on our list:

Buy from India's biggest CEA manufacturing company

Choose your structure and size and get the complete material list, priced this week.

Build your kit →

FAQs

Is a polyhouse in Nilanga eligible for NHB subsidy?

Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Latur district horticulture office.

How much subsidy can I get on 1 acre in Nilanga?

For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.

Is the subsidy paid on my bill or on the cost norm?

Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.

Can I build first and apply later?

No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.

Are hilly-area norms used in Maharashtra?

Not generally; Maharashtra uses general-area norms.

Does the material need to be ISI-marked?

The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.

Subsidy projects near Nilanga

The same guide for nearby towns, with the structure that suits each.

TownFrom NilangaDistrictCost normsSuits
Subsidy project in Umarga~40 kmDharashivGeneralNVPH or fan & pad
Subsidy project in Latur~50 kmLaturGeneralNVPH or fan & pad
Subsidy project in Udgir~60 kmLaturGeneralNVPH or fan & pad
Subsidy project in Rajura~90 kmChandrapurGeneralNVPH or fan & pad
Subsidy project in Ambejogai~100 kmBeedGeneralNVPH or fan & pad
Subsidy project in Osmanabad~100 kmDharashivGeneralNVPH or fan & pad

All towns: Subsidy projects by town

Sources

  1. NHB cost norms for protected cultivation
  2. NHB scheme guidelines (commercial horticulture)
  3. Mission for Integrated Development of Horticulture
  4. Kryzen: Polyhouse construction in Nilanga
  5. Kryzen: Polyhouse farming in Nilanga
  6. NASA POWER monthly climate averages for Nilanga
Build your kit