Subsidy guide · Lakhisarai district, Bihar
NHB Subsidy Eligible Protected Cultivation Project in Lakhisarai
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
Polyhouses and nethouses in Lakhisarai can get 50% government assistance, but which scheme applies depends on the size of your project, and the amount depends on the government cost norm, not your bill. This page walks through both routes for a project in Lakhisarai (Lakhisarai district), with a worked example for the structure that suits Lakhisarai's climate.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

Two subsidy routes for Lakhisarai growers
Both schemes pay 50%; the difference is size and paperwork. Small and medium projects usually go through MIDH (run in Bihar by the state horticulture mission), and larger commercial projects through the National Horticulture Board.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Lakhisarai district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Lakhisarai
Take a fan and pad polyhouse of 3,952 m² in Lakhisarai, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
Mandi price seasons around Lakhisarai
We averaged two years of daily Agmarknet prices from 11 markets in nearby districts (Sheikhpura, Begusarai, Jamui, Patna) for crops that are grown under cover. Bottle gourd swings the most: about ₹3,622 per quintal in November against ₹1,733 in June, a 109% difference. Tomato is the steadiest, which makes it a safer second crop.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Brinjal | 10 | ₹3,094/q | Nov · ₹3,479 | Jun · ₹2,480 | 40% |
| Bitter gourd | 6 | ₹3,535/q | Nov · ₹4,527 | Jun · ₹2,476 | 83% |
| Cucumber | 5 | ₹3,657/q | Nov · ₹4,623 | Jun · ₹2,668 | 73% |
| Bottle gourd | 3 | ₹2,714/q | Nov · ₹3,622 | Jun · ₹1,733 | 109% |
| Okra (bhindi) | 5 | ₹1,215/q | Oct · ₹1,511 | Nov · ₹800 | 89% |
| Tomato | 9 | ₹3,487/q | Oct · ₹3,671 | Aug · ₹3,208 | 14% |
| Green chilli | 4 | ₹4,405/q | Oct · ₹5,011 | Sep · ₹3,844 | 30% |
A planting calendar built on local prices
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, brinjal peaks in November; at about 60 days to first harvest, transplant in September.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Brinjal | Sep, Oct, Nov | ~60 | September | Jun |
| Bitter gourd | Oct, Nov | ~55 | September | Jun |
| Cucumber | Oct, Nov | ~40 | September | Jun |
| Bottle gourd | Oct, Nov | ~55 | September | Jun |
| Okra (bhindi) | Sep, Oct | ~45 | August | Nov |
| Tomato | Jun, Jul, Oct, Nov | ~75 | July | Aug |
| Green chilli | Jul, Oct | ~75 | July | Sep |
Twelve months of weather in Lakhisarai
May is the hottest month, with afternoons around 40.7°C; January nights drop to about 8.4°C. July is the wettest (285 mm of 1,036 mm a year), and humidity stays at 75% or more for 4 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 23.1°C | 8.4°C | 52% | 11 mm | 3.2 | 1.7 |
| Feb | 28.2°C | 12.4°C | 44% | 12 mm | 4.5 | 1.9 |
| Mar | 34.5°C | 18°C | 32% | 12 mm | 5.6 | 2.1 |
| Apr | 39.6°C | 23.7°C | 31% | 22 mm | 6.3 | 2.2 |
| May | 40.7°C | 27°C | 41% | 59 mm | 6.1 | 2.4 |
| Jun | 38°C | 28.1°C | 57% | 158 mm | 5.3 | 2.7 |
| Jul | 32.7°C | 26.1°C | 80% | 285 mm | 4.5 | 2.6 |
| Aug | 31.6°C | 25.5°C | 85% | 219 mm | 4.8 | 2.2 |
| Sep | 30.7°C | 24.4°C | 85% | 190 mm | 4.6 | 1.9 |
| Oct | 29.6°C | 20.5°C | 78% | 63 mm | 4.5 | 1.3 |
| Nov | 26.8°C | 14.5°C | 68% | 2 mm | 3.9 | 1.3 |
| Dec | 23.4°C | 9.8°C | 61% | 3 mm | 3.1 | 1.5 |
Which subsidised structure to build in Lakhisarai
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Lakhisarai's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps July–October rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Lakhisarai.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 41°C afternoon down to about 32°C inside, cool enough for leafy greens.

Square nethouse
Good fitFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Low rain here keeps it useful most of the year.

Curved nethouse
Good fitArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Rain passes through, so pick crops that tolerate it.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Lakhisarai? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Steps to apply
- 1
Pick the structure and size
Match it to Lakhisarai's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.
- 3
Apply before you build
MIDH: apply at the Lakhisarai district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Documents you will usually need
- Land records in your name (in Bihar: Khatiyan and land possession certificate), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Lakhisarai project
We supply the complete material for subsidy projects in Bihar from our Satara factory, about 1,930 km from Lakhisarai. See the kit and live price for your structure:
Lakhisarai within Bihar
Lakhisarai is mid-table for heat in Bihar (38th of 71), and in the middle for rain (37th). These are the larger towns we supply elsewhere in Bihar.
- Subsidy project in Patna
- Subsidy project in Gaya
- Subsidy project in Bhagalpur
- Subsidy project in Muzaffarpur
- Subsidy project in Bihar Sharif
- Subsidy project in Darbhanga
- Subsidy project in Purnia
- Subsidy project in Arrah
- Subsidy project in Begusarai
- Subsidy project in Katihar
- Subsidy project in Munger
- Subsidy project in Chhapra
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Lakhisarai eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Lakhisarai district horticulture office.
How much subsidy can I get on 1 acre in Lakhisarai?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Is the subsidy paid on my bill or on the cost norm?
Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.
Can I build first and apply later?
No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.
Are hilly-area norms used in Bihar?
Not generally; Bihar uses general-area norms.
Subsidy projects near Lakhisarai
The same guide for nearby towns, with the structure that suits each.
| Town | From Lakhisarai | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Sheikhpura | ~30 km | Sheikhpura | General | NVPH or fan & pad |
| Subsidy project in Begusarai | ~40 km | Begusarai | General | NVPH or fan & pad |
| Subsidy project in Jamui | ~40 km | Jamui | General | NVPH or fan & pad |
| Subsidy project in Mokameh | ~40 km | Patna | General | NVPH or fan & pad |
| Subsidy project in Jamalpur | ~60 km | Munger | General | NVPH or fan & pad |
| Subsidy project in Munger | ~60 km | Munger | General | NVPH or fan & pad |