Subsidy guide · Nizamabad district, Telangana
NHB Subsidy Eligible Protected Cultivation Project in Kamareddy
By Editorial Team, Kryzen Biotech · Updated 12 November 2026
If you are planning a polyhouse or nethouse in Kamareddy with government support, start here. We supply the material for subsidy projects across Telangana and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Kamareddy's climate and the general-area cost norms.
- NHB route
- Projects above 2,500 m²
- MIDH / NHM route
- Up to 4,000 m² per farmer
- Cost norms here
- General area
- Structure for this climate
- NVPH or fan & pad

NHB or MIDH: which scheme fits a project in Kamareddy
For a project in Kamareddy the first question is size. Up to 4,000 m², the MIDH route through the Telangana horticulture department is usually simpler. Above 2,500 m², an NHB project with a bank loan becomes possible.
| MIDH / NHM (state mission) | NHB commercial project | |
|---|---|---|
| Who it is for | Individual farmers, groups, FPOs | Commercial projects: farmers, companies, FPOs, entrepreneurs |
| Project size | Up to 4,000 m² per beneficiary | Above 2,500 m² (1,000 m² in the North-East) |
| Assistance | 50% of cost, up to the cost norm | 50% of project cost at admissible norms, credit-linked and back-ended |
| Ceiling | Area limit per beneficiary | ₹56 lakh per project in the NHB scheme guidelines; check the current limit |
| Bank loan | Not always needed | Needed: subsidy is credited to the term loan |
| Apply at | the Nizamabad district horticulture office | NHB online portal (In-Principle Approval) and your bank |
Worked example: a 3,952 m² project in Kamareddy
Take a fan and pad polyhouse of 3,952 m² in Kamareddy, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's general norms:
| Item | Amount |
|---|---|
| Structure | Fan and pad polyhouse |
| Area | 3,952 m² (about one acre) |
| Structure cost norm | ₹1,400 per m² |
| Eligible structure cost | ₹55,32,800 |
| Planting material norm (high-value vegetables) | ₹140 per m² → ₹5,53,280 |
| Eligible project cost | ₹60,86,080 |
| Maximum subsidy at 50% of the norm | ₹30,43,040 (₹30.43 lakh) |
| Our material price this week (incl. GST) | ₹32,48,775 (₹822/m²) |
Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,400; freight and erection come on top.
Mandi price seasons around Kamareddy
We averaged two years of daily Agmarknet prices from 9 markets in nearby districts (Medak, Karimnagar) for crops that are grown under cover. Cucumber swings the most: about ₹1,548 per quintal in June against ₹458 in November, a 238% difference. Ridge gourd is the steadiest, which makes it a safer second crop.
| Crop | Markets | Average | Highest month | Lowest month | Swing |
|---|---|---|---|---|---|
| Okra (bhindi) | 9 | ₹2,251/q | Nov · ₹2,923 | Apr · ₹1,647 | 77% |
| Brinjal | 9 | ₹1,872/q | Nov · ₹2,757 | Mar · ₹945 | 192% |
| Bitter gourd | 9 | ₹2,639/q | Jun · ₹3,407 | Apr · ₹2,006 | 70% |
| Ridge gourd | 6 | ₹2,942/q | Jan · ₹3,589 | Apr · ₹2,334 | 54% |
| Green chilli | 9 | ₹2,429/q | Jun · ₹3,023 | Mar · ₹1,468 | 106% |
| Cabbage | 9 | ₹1,095/q | Nov · ₹1,617 | Apr · ₹623 | 160% |
| Beans | 8 | ₹3,332/q | Sep · ₹4,382 | Apr · ₹2,465 | 78% |
| Cucumber | 8 | ₹981/q | Jun · ₹1,548 | Nov · ₹458 | 238% |
Timing your crop for the Kamareddy market
Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, okra (bhindi) peaks in November; at about 45 days to first harvest, transplant in September.
| Crop | Sells best | Days to first harvest | Transplant / sow in | Avoid harvesting in |
|---|---|---|---|---|
| Okra (bhindi) | Oct, Nov | ~45 | September | Apr |
| Brinjal | Nov | ~60 | September | Mar |
| Bitter gourd | May, Jun | ~55 | April | Apr |
| Ridge gourd | Jan, Feb, Jun, Dec | ~50 | November | Apr |
| Green chilli | May, Jun, Jul, Nov | ~75 | March | Mar |
| Cabbage | Jun, Nov | ~75 | August | Apr |
| Beans | Sep, Oct | ~50 | July | Apr |
| Cucumber | Jun | ~40 | April | Nov |
Twelve months of weather in Kamareddy
May is the hottest month, with afternoons around 41.5°C; December nights drop to about 13.9°C. August is the wettest (213 mm of 853 mm a year), and humidity stays at 75% or more for 4 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Oct, Nov, Dec.
| Month | Afternoon high | Night low | Humidity | Rain | Sun (kWh/m²/day) | Wind (m/s) |
|---|---|---|---|---|---|---|
| Jan | 30.4°C | 14.3°C | 43% | 8 mm | 4.8 | 1.9 |
| Feb | 34°C | 17.5°C | 35% | 6 mm | 5.7 | 2.1 |
| Mar | 37.6°C | 21.5°C | 30% | 19 mm | 6.2 | 2 |
| Apr | 40.5°C | 25.5°C | 30% | 18 mm | 6.8 | 2.1 |
| May | 41.5°C | 27.9°C | 32% | 22 mm | 6.8 | 3 |
| Jun | 34.6°C | 24.9°C | 61% | 122 mm | 5.4 | 3.7 |
| Jul | 30.7°C | 22.8°C | 77% | 207 mm | 4.5 | 3.7 |
| Aug | 29.3°C | 22.2°C | 83% | 213 mm | 4.4 | 3.1 |
| Sep | 29.2°C | 21.8°C | 84% | 152 mm | 4.9 | 2.1 |
| Oct | 29.5°C | 19.5°C | 76% | 73 mm | 5.1 | 1.7 |
| Nov | 29.3°C | 16.1°C | 66% | 11 mm | 4.9 | 1.8 |
| Dec | 29.2°C | 13.9°C | 52% | 2 mm | 4.6 | 1.8 |
Steps to apply
- 1
Pick the structure and size
Match it to Kamareddy's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.
- 2
Get a quotation and project report
An itemised supplier quotation with HSN codes, and for NHB a detailed project report (DPR) with costs, crop plan and cash flow.
- 3
Apply before you build
MIDH: apply at the Nizamabad district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.
- 4
Bank loan (NHB)
Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.
- 5
Build to standard
Build with BIS-standard material and keep every test certificate and invoice: inspectors check the structure against the approved design.
- 6
Inspection and release
After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Eligible structures and how they suit Kamareddy
All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Kamareddy's weather.

Naturally ventilated polyhouse
Best fitFilm roof keeps July–October rain off the crop; roof vents and roll-up curtains move air without power. The usual first choice in Kamareddy.

Fan & pad polyhouse
Good fitExhaust fans pull air through wet pads. In May that can take a 42°C afternoon down to about 30°C inside, cool enough for leafy greens.

Square nethouse
SeasonalFlat-roof 4 × 4 m grid with shade and insect net, the NHB nursery design. Best from October to February, when rain is low.

Curved nethouse
SeasonalArched GI frame covered in shade net: taller crops, more air and a lower cost than a polyhouse. Shading pays off when sunlight peaks in May.
Planting material norms and crops that suit
NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.
| Crop group | NHB norm | Suits Kamareddy? |
|---|---|---|
| High-value vegetables | ₹140 per m² | Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens |
| Orchid and anthurium | ₹700 per m² | Less suited |
| Carnation and gerbera | ₹610 per m² | Yes: Gerbera and rose |
| Rose and lilium | ₹426 per m² | Yes: Gerbera and rose |
Documents you will usually need
- Land records in your name (in Telangana: Pahani and pattadar passbook), or a registered lease, with a site map
- Aadhaar, PAN and bank details; for companies and FPOs, registration papers
- Soil and water test report
- Supplier quotation with HSN codes and specifications
- Detailed project report and bank sanction letter (NHB)
- Test certificates and invoices for the material, after purchase
What we provide for your file:

Itemised quotation
Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates
Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI
GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.
Material for your Kamareddy project
We supply the complete material for subsidy projects in Telangana from our Satara factory, about 610 km from Kamareddy. See the kit and live price for your structure:
Across Nizamabad district
Among the 40 towns we supply in Telangana, Kamareddy ranks 13th for summer heat and 22nd for yearly rain. Other Nizamabad district towns on our list:
Buy from India's biggest CEA manufacturing company
Choose your structure and size and get the complete material list, priced this week.
FAQs
Is a polyhouse in Kamareddy eligible for NHB subsidy?
Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Nizamabad district horticulture office.
How much subsidy can I get on 1 acre in Kamareddy?
For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹30.43 lakh at NHB's general norms (50% of ₹60,86,080). The sanctioned figure depends on the approved project.
Can I build first and apply later?
No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.
Are hilly-area norms used in Telangana?
Not generally; Telangana uses general-area norms.
Does the material need to be ISI-marked?
The schemes expect structures that conform to technical standards. Our GI pipes carry the ISI mark and every order ships with lab test certificates.
Do you help with the subsidy file?
We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.
Subsidy projects near Kamareddy
The same guide for nearby towns, with the structure that suits each.
| Town | From Kamareddy | District | Cost norms | Suits |
|---|---|---|---|---|
| Subsidy project in Medak | ~40 km | Medak | General | NVPH or fan & pad |
| Subsidy project in Nizamabad | ~60 km | Nizamabad | General | NVPH or fan & pad |
| Subsidy project in Sircilla | ~60 km | Karimnagar | General | NVPH or fan & pad |
| Subsidy project in Bodhan | ~80 km | Nizamabad | General | NVPH or fan & pad |
| Subsidy project in Siddipet | ~80 km | Medak | General | NVPH or fan & pad |
| Subsidy project in Koratla | ~90 km | — | General | NVPH or fan & pad |