How it worksBuy individual items

Subsidy guide · Nainital district, Uttarakhand

NHB Subsidy Eligible Protected Cultivation Project in Haldwani-cum-Kathgodam

By Editorial Team, Kryzen Biotech · Updated 12 November 2026

If you are planning a polyhouse or nethouse in Haldwani-cum-Kathgodam with government support, start here. We supply the material for subsidy projects across Uttarakhand and see the same questions every week: which scheme, how much, what papers and in what order. The answers below use Haldwani-cum-Kathgodam's climate and the higher hilly-area cost norms.

NHB route
Projects above 2,500 m²
MIDH / NHM route
Up to 4,000 m² per farmer
Cost norms here
Hilly (+15%)
Structure for this climate
NVPH or fan & pad
Subsidy-eligible protected cultivation project like those planned in Haldwani-cum-Kathgodam
Polyhouses, fan and pad houses and nethouses all qualify for 50% assistance at the cost norm.

Two subsidy routes for Haldwani-cum-Kathgodam growers

Both schemes pay 50%; the difference is size and paperwork. Small and medium projects usually go through MIDH (run in Uttarakhand by the state horticulture mission), and larger commercial projects through the National Horticulture Board.

MIDH / NHM (state mission)NHB commercial project
Who it is forIndividual farmers, groups, FPOsCommercial projects: farmers, companies, FPOs, entrepreneurs
Project sizeUp to 4,000 m² per beneficiaryAbove 2,500 m² (1,000 m² in the North-East)
Assistance50% of cost, up to the cost norm50% of project cost at admissible norms, credit-linked and back-ended
CeilingArea limit per beneficiary₹56 lakh per project in the NHB scheme guidelines; check the current limit
Bank loanNot always neededNeeded: subsidy is credited to the term loan
Apply atthe Nainital district horticulture officeNHB online portal (In-Principle Approval) and your bank
From the NHB cost norms and MIDH guidelines. Limits and norms are revised from time to time and states may add their own top-up; confirm current figures with the state horticulture department before you apply.

Worked example: a 3,952 m² project in Haldwani-cum-Kathgodam

Take a fan and pad polyhouse of 3,952 m² in Haldwani-cum-Kathgodam, growing high-value vegetables. At that size it can go to NHB as a commercial project, or to MIDH since it is under 4,000 m². The most it can receive at NHB's hilly-area norms:

ItemAmount
StructureFan and pad polyhouse
Area3,952 m² (about one acre)
Structure cost norm (hilly)₹1,610 per m²
Eligible structure cost₹63,62,720
Planting material norm (high-value vegetables)₹140 per m² → ₹5,53,280
Eligible project cost₹69,16,000
Maximum subsidy at 50% of the norm₹34,58,000 (₹34.58 lakh)
Our material price this week (incl. GST)₹32,48,775 (₹822/m²)
Indicative only: the sanctioned amount depends on the approved project, current norms and inspection. Material price is ours, ex-factory, without freight or erection.

Assistance is usually 50% of your actual eligible cost or of the cost norm, whichever is lower, so put every eligible cost in the project report: material, freight, erection, drip and planting material. Our material alone comes to ₹822 per m² this week against a structure norm of ₹1,610; freight and erection come on top.

Local market prices for polyhouse crops near Haldwani-cum-Kathgodam

Across 4 mandis in Nainital district, 8 polyhouse and nethouse crops trade regularly. Tomato has the most arrivals; Tomato has the widest price swing (261%), peaking in August.

CropMarketsAverageHighest monthLowest monthSwing
Tomato4₹1,705/qAug · ₹2,823Feb · ₹781261%
Bottle gourd4₹1,337/qDec · ₹1,773Jun · ₹1,02174%
Cauliflower4₹1,362/qOct · ₹2,125Feb · ₹649227%
Cucumber4₹1,688/qNov · ₹2,046May · ₹1,34252%
Green chilli4₹1,971/qMar · ₹2,405May · ₹1,57353%
Brinjal4₹1,115/qNov · ₹1,435Mar · ₹94652%
Okra (bhindi)4₹1,941/qFeb · ₹2,682Jun · ₹1,43787%
Papaya3₹2,013/qMay · ₹2,652Jun · ₹1,62863%
Agmarknet daily modal prices via data.gov.in, Nov 2024 – Nov 2026, markets in Nainital district. ₹ per quintal (100 kg).

When to plant in Haldwani-cum-Kathgodam for the best prices

Working back from the month each crop sells highest locally, with typical days from transplanting to first harvest under cover. For example, tomato peaks in August; at about 75 days to first harvest, transplant in May.

CropSells bestDays to first harvestTransplant / sow inAvoid harvesting in
TomatoAug~75MayFeb
Bottle gourdNov, Dec~55OctoberJun
CauliflowerOct~75JulyFeb
CucumberSep, Oct, Nov~40SeptemberMay
Green chilliMar, Oct, Nov~75DecemberMay
BrinjalSep, Nov~60SeptemberMar
Okra (bhindi)Feb, Mar, Apr~45DecemberJun
Days to harvest are typical for polyhouse and nethouse crops and vary by variety and season. Plan nursery raising 3–5 weeks before transplanting.

Haldwani-cum-Kathgodam month by month

May is the hottest month, with afternoons around 40.8°C; January nights drop to about 7.8°C. July is the wettest (383 mm of 1,217 mm a year), and humidity stays at 75% or more for 2 months. The mildest growing months, with afternoons of 20–32°C and little rain, are Jan, Feb, Mar, Oct, Nov, Dec.

MonthAfternoon highNight lowHumidityRainSun (kWh/m²/day)Wind (m/s)
Jan20.7°C7.8°C47%27 mm3.41.6
Feb24.6°C10.7°C45%35 mm4.41.9
Mar31°C15.4°C36%23 mm5.72.1
Apr37.5°C21.6°C26%24 mm6.52.3
May40.8°C26°C26%41 mm6.82.3
Jun40°C27.9°C41%148 mm5.92.3
Jul33.7°C26.2°C73%383 mm4.42
Aug31.4°C25°C83%302 mm4.41.6
Sep30.7°C23°C79%199 mm4.91.5
Oct29.7°C18.6°C61%20 mm51.3
Nov25.7°C13.5°C52%4 mm4.11.4
Dec21.7°C9.2°C47%11 mm3.51.5
NASA POWER long-term monthly averages for Haldwani-cum-Kathgodam (29.22, 79.53).

Which subsidised structure to build in Haldwani-cum-Kathgodam

All four structures we supply are covered by the schemes. What matters for the project's success is the fit with Haldwani-cum-Kathgodam's weather.

Planting material norms and crops that suit

NHB also counts planting material and cultivation in the project cost, at these norms. The right column shows which groups suit this climate.

Crop groupNHB normSuits Haldwani-cum-Kathgodam?
High-value vegetables₹140 per m²Yes: Coloured capsicum, Cucumber (parthenocarpic), Lettuce and leafy greens
Orchid and anthurium₹700 per m²Less suited
Carnation and gerbera₹610 per m²Yes: Gerbera and rose
Rose and lilium₹426 per m²Yes: Gerbera and rose

Steps to apply

  1. 1

    Pick the structure and size

    Match it to Haldwani-cum-Kathgodam's climate (see above) and your market. Keep under 4,000 m² for MIDH, or above 2,500 m² for an NHB project.

  2. 2

    Get a quotation and project report

    A supplier quotation listing every item with its HSN code, and for an NHB project a DPR covering cost, the high-value vegetables crop plan and repayment.

  3. 3

    Apply before you build

    MIDH: apply at the Nainital district horticulture office. NHB: file for In-Principle Approval on the NHB portal; NHB has required IPA before work starts since 2017.

  4. 4

    Bank loan (NHB)

    Get the term loan sanctioned. The subsidy is back-ended: it is paid into the loan account after the project is complete.

  5. 5

    Build to standard

    Use materials that meet BIS standards and keep the test certificates; the inspection checks structure and specification.

  6. 6

    Inspection and release

    After a joint inspection, the subsidy is released to your bank (NHB) or to you (MIDH, as per the state process).

Subsidy application steps for a polyhouse project in Haldwani-cum-Kathgodam

Documents you will usually need

  • Land records in your name (in Uttarakhand: Khatauni), or a registered lease, with a site map
  • Aadhaar, PAN and bank details; for companies and FPOs, registration papers
  • Soil and water test report
  • Supplier quotation with HSN codes and specifications
  • Detailed project report and bank sanction letter (NHB)
  • Test certificates and invoices for the material, after purchase

What we provide for your file:

Itemised quotation for Haldwani-cum-Kathgodam

Itemised quotation

Every item with size, quantity, HSN code and GST, ready to attach to the application.

Lab test certificates for Haldwani-cum-Kathgodam

Lab test certificates

Tensile, chemical, salt spray and other tests on the steel, by third-party labs.

ISI-marked GI for Haldwani-cum-Kathgodam

ISI-marked GI

GI pipes from Tata, Jindal or JSW steel, with a 15-year warranty.

Material for your Haldwani-cum-Kathgodam project

We supply the complete material for subsidy projects in Uttarakhand from our Satara factory, about 1,780 km from Haldwani-cum-Kathgodam. See the kit and live price for your structure:

Haldwani-cum-Kathgodam and the rest of Nainital district

Haldwani-cum-Kathgodam is one of the hotter towns in Uttarakhand (2nd of 17 we cover), and among the driest (14th for rain). We also supply 2 other towns in Nainital district.

Buy from India's biggest CEA manufacturing company

Choose your structure and size and get the complete material list, priced this week.

Build your kit →

FAQs

Is a polyhouse in Haldwani-cum-Kathgodam eligible for NHB subsidy?

Yes, if the project is above 2,500 m² and set up as a commercial project with a bank loan. NHB gives a credit-linked, back-ended subsidy of 50% of project cost at its norms. Smaller projects can apply under MIDH through the Nainital district horticulture office.

How much subsidy can I get on 1 acre in Haldwani-cum-Kathgodam?

For a 3,952 m² fan and pad polyhouse with high-value vegetables, up to about ₹34.58 lakh at NHB's hilly norms (50% of ₹69,16,000). The sanctioned figure depends on the approved project.

Do you help with the subsidy file?

We provide the itemised quotation, specifications and test certificates the file needs. The application itself is made by you to the department or NHB.

Is the subsidy paid on my bill or on the cost norm?

Usually on whichever is lower: your actual eligible cost or the admissible cost norm. Include every eligible cost (material, freight, erection, irrigation, planting material) in the project report.

Can I build first and apply later?

No. NHB requires In-Principle Approval before work starts, and MIDH applications are approved before the structure is built. Apply first.

Are hilly-area norms used in Uttarakhand?

Yes, Uttarakhand is treated as a hilly state, so cost norms are about 15% higher, which raises the subsidy.

Subsidy projects near Haldwani-cum-Kathgodam

The same guide for nearby towns, with the structure that suits each.

TownFrom Haldwani-cum-KathgodamDistrictCost normsSuits
Subsidy project in Nainital~30 kmNainitalHillyNVPH / nethouse
Subsidy project in Rudrapur~40 km—HillyNVPH or fan & pad
Subsidy project in Sitarganj~50 kmUdham Singh NagarHillyNVPH or fan & pad
Subsidy project in Ramnagar~60 kmNainitalHillyNVPH or fan & pad
Subsidy project in Suar~70 kmRampurGeneralNVPH or fan & pad
Subsidy project in Kashipur~70 kmUdham Singh NagarHillyNVPH or fan & pad

All towns: Subsidy projects by town

Sources

  1. NHB cost norms for protected cultivation
  2. NHB scheme guidelines (commercial horticulture)
  3. Mission for Integrated Development of Horticulture
  4. Kryzen: Polyhouse construction in Haldwani-cum-Kathgodam
  5. Kryzen: Polyhouse farming in Haldwani-cum-Kathgodam
  6. NASA POWER monthly climate averages for Haldwani-cum-Kathgodam
Build your kit