Solar Backup Battery Size for Polyhouse Climate Equipment
Polyhouse Constructions Agronomy Desk · ನವೆಂ 13, 2026
A correct battery size for polyhouse power backup starts with one question: which equipment must run during a power cut, and for how long? Add the running wattage of those essential loads, multiply by the required backup time, then allow for inverter loss, safe battery discharge limit and a reserve margin.
For a fan-and-pad polyhouse, the full cooling system can draw several kilowatts. A battery system that runs all fans and pumps for many hours becomes expensive quickly. In many farms, it is more practical to back up the controller, alarms, communication, selected circulation or exhaust fans, and one critical pump for a shorter emergency period. A diesel generator or grid-connected solar system may cover longer outages.
Start with the emergency load, not the connected load
Do not size a battery from the total electrical load listed in the project. A polyhouse may have fans, cooling-pad pumps, foggers, fertigation pumps, lights, curtain motors and office loads. They do not all need to operate during every cut.
Make two lists:
- Essential emergency load: Equipment needed to prevent rapid crop stress, protect automation and keep a basic water/cooling function available.
- Non-essential load: Equipment that can wait until grid power or a generator returns.
In severe summer conditions, ventilation is usually the priority. However, the exact priority depends on the crop, outside temperature, house design, shade arrangement, crop stage and the expected duration of the cut. In a naturally ventilated structure, roll-up side curtains may provide passive relief if they can be opened safely. A fan-and-pad house depends much more on powered ventilation.
Use the motor nameplate or a clamp meter reading for every item. Do not estimate motor wattage from its physical size. Nameplate power, actual running current and starting current can differ.
Equipment | Typical backup priority | What to record for calculation | Important note |
|---|---|---|---|
Climate controller, sensors and alarms | Very high | Watts or VA | Small energy use, but vital for monitoring and restart logic |
Exhaust fans | High in fan-and-pad houses | kW on motor plate; number of fans | Usually the largest backup load |
Cooling-pad circulation pump | High when pad cooling is needed | kW on pump plate | Run only with adequate fan airflow; do not soak pads without proper operation |
HAF/air-circulation fans | Medium to high | Watts per fan | Useful for air movement, but not a substitute for exhaust ventilation |
Fogger pump | Crop and weather dependent | kW and duty cycle | Include only its actual run minutes, not 24-hour running |
Fertigation pump | Usually low for emergency backup | kW and planned operating time | A scheduled irrigation event may still be essential in hot weather |
Lights, office sockets, chargers | Low | Watts | Keep separate unless genuinely required |
Before selecting fans and pumps, calculate the total connected and operating load properly. This electricity load calculation guide is useful for preparing the equipment list.
The battery sizing formula in kWh and Ah
First calculate energy in kilowatt-hours (kWh). This is the most reliable way to compare batteries, whether they are lead-acid or lithium batteries.
Step 1: Running energy needed
Load energy (kWh) = total running load (kW) × backup time (hours)
If some equipment runs intermittently, calculate its duty cycle separately:
Intermittent load energy = equipment kW × total run hours during the cut
Step 2: Convert this to nominal battery capacity
Nominal battery kWh = load energy × reserve factor ÷ (inverter efficiency × usable battery discharge fraction)
For initial planning, use these conservative ranges:
- Reserve factor: 1.15 to 1.25. This covers ageing, warm battery conditions and uncertainty in the actual outage duration.
- Inverter efficiency: about 0.85 to 0.93 at a useful operating load.
- Usable discharge fraction: about 0.80 to 0.90 for a suitably specified lithium iron phosphate battery system; about 0.50 for lead-acid if long life is expected.
The resulting number is nominal battery capacity, not merely usable capacity. Ask the supplier to clearly state both values in the quotation.
To express the bank in amp-hours:
Battery capacity (Ah) = nominal battery Wh ÷ battery bank voltage
For example, a 48 V battery bank with 7,200 Wh nominal capacity is:
7,200 ÷ 48 = 150 Ah
For climate equipment, 48 V is generally more practical than 12 V or 24 V once loads become substantial. Higher DC voltage reduces current, cable size and heat loss. The final configuration must be designed by a qualified solar/electrical professional with correct DC fuses, isolators, earthing and battery protection.
Worked example: a short emergency backup system
Assume a grower wants one hour of emergency operation for the following selected loads. This is only a sizing example. Do not copy it for a particular area of polyhouse; actual fan and pump ratings vary widely.
Selected load | Quantity and rating | Running load | Planned run time | Energy needed |
|---|---|---|---|---|
Exhaust fans | 4 × 0.75 kW | 3.00 kW | 1 hour | 3.00 kWh |
Cooling-pad pump | 1 × 0.75 kW | 0.75 kW | 1 hour | 0.75 kWh |
HAF fan | 1 × 0.12 kW | 0.12 kW | 1 hour | 0.12 kWh |
Controller, sensors and alarm | Combined | 0.05 kW | 1 hour | 0.05 kWh |
Total |
| 3.92 kW |
| 3.92 kWh |
For a lithium battery plan, assume a 20% reserve factor, 90% inverter efficiency and 80% usable battery discharge:
Nominal battery kWh = 3.92 × 1.20 ÷ (0.90 × 0.80)
= 6.53 kWh, rounded upward
At 48 V:
6,530 Wh ÷ 48 V = 136 Ah
A designer would normally select the next suitable standard size rather than an exact 136 Ah bank. The battery’s continuous discharge rating must also safely support the inverter demand.
With a lead-acid bank, using 85% inverter efficiency and 50% usable discharge:
3.92 × 1.20 ÷ (0.85 × 0.50) = about 11.1 kWh nominal
This shows why battery chemistry changes both backup size and project cost. It is not enough to compare only Ah ratings.
Size the inverter for motors and starting surge
Battery capacity decides how long the equipment can run. The inverter decides whether it can start and operate the equipment.
An inverter should have enough continuous rating for the selected running load, with a practical margin. For a 3.92 kW example load, a system designer may assess an inverter above the exact running total, but the required size also depends on motor starting method and power factor.
Induction motors can draw several times their running current while starting. If multiple fans or a pump start together, a normal inverter may trip even when its stated continuous kW rating appears adequate.
Use these safeguards:
- Start loads one at a time through a controller sequence.
- Give each motor a restart delay after a power failure.
- Check the inverter’s surge rating and surge duration, not only its headline kVA number.
- Consider soft starters or variable-frequency drives where technically suitable.
- Keep the controller and contactors on the backup circuit so automatic staging works during a cut.
- Ask the electrician to check cable voltage drop, earthing, MCB/MCCB coordination and motor overload protection.
Good control logic can reduce capital cost. For example, an emergency mode may run a selected fan bank first, then bring in the pad pump only when temperature demands it. The safe sequence should be set with your agronomist and electrical designer. For fan count and capacity, read how to calculate exhaust fan size before deciding which fans belong on the backup circuit.
Battery type and solar charging: what affects cost
For cost planning, compare complete usable backup systems, not just battery purchase price. A realistic quotation should separately show battery, inverter/charger, solar modules if included, mounting structure, protections, cables, installation, monitoring and applicable taxes.
Option | Upfront cost tendency | Practical usable capacity | Maintenance and life considerations | Best fit |
|---|---|---|---|---|
Tubular lead-acid battery | Usually lower initially | Keep discharge conservative, often around 50% for better life | Needs ventilation and periodic attention; capacity falls with age | Small, occasional backup where battery room maintenance is reliable |
Lithium iron phosphate battery | Usually higher initially | Often more usable capacity from the nominal bank | Lower routine maintenance; check BMS, warranty terms and service support | Frequent cycling, compact battery room and larger daily solar use |
Solar plus battery plus generator/grid | Higher system complexity | Battery can cover short bridging periods | Generator or grid handles extended cloudy or long-cut conditions | Fan-and-pad houses with high critical load |
Solar panel capacity must be calculated separately from battery capacity. Panels need to recharge the battery after an outage and support daytime operating loads. In most Indian locations, solar generation changes with season, dust, cloud, module temperature and shading. A simple planning relationship is:
Required solar kWp = daily energy to be supplied ÷ (peak sun hours × overall system performance factor)
The performance factor includes inverter, wiring, temperature and dust losses. It is commonly kept below 1. A solar designer should use site-specific generation data and decide whether the array will primarily offset daily electricity, recharge backup batteries, or both.
For longer outages, compare the cost of adding more battery hours against a generator with automatic changeover. There is no one correct answer: the economical option depends on outage frequency, fuel access, crop value and whether grid supply is stable.
Reduce the battery size before buying more batteries
The least-cost battery is often the capacity you avoid needing. Review the climate strategy before finalising the system.
Practical ways to reduce emergency energy demand
- Divide exhaust fans into stages. Put essential and secondary fans on separate contactors. The controller can run only the critical stage during a short cut.
- Maintain motors and pads. Dirty shutters, bearing problems, clogged pads and poor water flow increase stress and waste power. Follow a planned cellulose pad maintenance schedule.
- Use passive heat-reduction measures. Suitable external shading, clean polyfilm, functioning vents and correctly operated curtains slow temperature rise. They do not replace powered cooling in extreme weather.
- Set realistic emergency runtime. Use local outage history. One hour, two hours and four hours require very different battery budgets.
- Separate irrigation timing. If practical, avoid running a large fertigation pump during the hottest high-risk period of an outage. Do not delay essential irrigation beyond what the crop and growing media can tolerate.
- Install alarms and remote alerts. A low-energy controller and phone alert allow a worker to respond early, start the generator or open passive ventilation.
Read this guide on preventing heat stress during polyhouse power cuts when preparing the emergency operating procedure.
A buying checklist for an accurate quote
Give each solar supplier the same information. This makes quotations comparable.
- A load sheet with motor nameplate photos, quantity and running schedule.
- Required backup duration for summer, monsoon and winter.
- List of loads that must start at the same time.
- Existing electrical supply details and generator availability.
- Expected grid-cut frequency and typical maximum outage duration.
- Preferred battery location, ventilation, dust protection and safe access.
- Required solar objective: bill saving, emergency backup, or both.
- Written confirmation of nominal kWh, usable kWh, discharge limit, inverter continuous kW, surge capacity and warranty terms.
- A single-line electrical diagram showing isolators, fuses, earthing and changeover arrangement.
Do not connect a battery inverter to the farm wiring without a proper changeover arrangement. Back-feeding power into the utility line is dangerous. Test the system before summer: simulate a grid failure, verify staged starting and record how long the selected loads actually run.
Next steps
Prepare a one-page emergency load sheet, decide the maximum safe outage period, and get the battery bank and inverter designed from those figures. For a new fan-and-pad project, finalise fan and pump ratings first; fan-and-pad polyhouse details can help you understand the equipment involved.
For the protected structure and climate-equipment material list, you can build a kit with live weekly rates. Polyhouse Constructions supplies structure and material kits; solar backup design, electrical work and installation should be handled by qualified specialists.
Frequently asked questions
How many batteries are needed for a 1-acre polyhouse?
Area alone cannot decide battery quantity. The answer depends on the actual kW of selected fans, pumps and controls, the backup hours needed, and whether all equipment must operate together. A 1-acre fan-and-pad house can have a much higher emergency load than a naturally ventilated house.
Can a solar battery run exhaust fans and a cooling-pad pump together?
Yes, if the inverter has adequate continuous output and motor-starting surge capacity, and the battery can provide the required current. Use staged starting so the pump and multiple fan motors do not start simultaneously.
Should I choose a 12 V, 24 V or 48 V battery system?
For small control-only backup, lower-voltage systems may be used. For several motor loads, 48 V is generally preferable because DC current and cable losses are lower. The final voltage should match the inverter and protection design.
How long will a 5 kWh battery last in a polyhouse?
It depends on usable battery capacity and the actual load. If 4 kWh is safely usable and the emergency load is 2 kW, it may run for roughly two hours after allowing for inverter losses; motor starts and battery age can reduce this.
Can I use the same solar system for daytime power saving and power-cut backup?
Yes, a hybrid solar system can be designed for both purposes. It needs correct control settings, adequate battery recharge capacity and a clear priority for critical climate loads during an outage.